BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a transportation facility in Hailey, Idaho. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

Apron Pavement Maintenance consists of AOA barricade placement, pavement marking removal, crack seal, seal coat, concrete crack repair, joint seal replacement, spall repair, inlet repair, concrete corner breaks, temporary markings, and site cleanup on Section 2, Section 4, Terminal Apron, and Runway 13-31. Permanent pavement markings will be applied in the Spring of 2025. FAA/AIP PROJECT NO. 3-16-0016-061 Question Deadline 04/19/2024 Questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing, to be received at least three business days before the date and time upon which bids are scheduled to be opened. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda. Construction is anticipated to start shortly after award on May 28th.

Post-Bid

Transportation Terminals

$600,000.00

Public - City

Paving, Site Work

38

29

2

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
3
Bidding Soon
130
All Active Projects
33
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 24, 2024

May 24, 2024

June 29, 2024

img_map_placeholder

1616 Airport Cir, Hailey, ID

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.