BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 6, 2025 at 7:00 PM

Updated January 7, 2025

Site work for a municipal facility in Mount Vernon, Ohio. Completed plans call for site work for a municipal facility.

As of January 6, 2025, a general contractor has been awarded and construction is underway. *The closed solicitation has been included below for reference: Attention of bidders is called to all of the requirements contained in this bid packet, particularly to the Federal Labor Standards Provisions and Davis-Bacon Wages, various insurance requirements, various equal opportunity provisions. No bidder may withdraw his bid within sixty (60) days after the actual date of the opening thereof. The City of Mount Vernon reserves the right to waive any informalities or to reject any or all bids. The Engineer's cost estimate (Construction Cost with Alternate Bid Option 1 with contingencies is ($3,597,586.16) Dollars. The Engineer's cost estimate (Construction Cost with Alternate Bid Option 2 with contingencies is ($3,945,162.38) Dollars.

Under Construction

Municipal

$3,945,162.00

Public - City

Site Work

112

5

2

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 31 - Earthwork

Division 31 - Earthwork

Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
265
Active Projects
136
Bidding Soon
2,853
All Active Projects
1,669
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2024

September 2, 2024

img_map_placeholder

Multiple Locations, Mount Vernon, OH

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.