BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Brier, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

2024 Pavement Preservation Project. The 2024 Pavement Preservation Project proposes to plane and remove a 2-inch section of existing asphalt pavement and replace with a new 2-inch section of asphalt pavement. In addition, five (5) pedestrian curb ramps will be replaced in order to meet current ADA PROWAG guidelines. The 2024 Pavement Preservation Project proposes to plane and remove a 2-inch section of existing asphalt pavement and replace with a new 2-inch section of asphalt pavement. In addition, five (5) pedestrian curb ramps will be replaced in order to meet current ADA PROWAG guidelines. The total estimated cost for this project is in the range of $ 50,000 to $ 00,000. The number of working days for Physical Completion of this project is 30 Working Days. Please contact John Forba. at 425.827.2014 for any questions regarding this project The number of working days for Physical Completion of this project is 30 Working Days. No paper plan sets will be provided. The City of Brier in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 USC 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-Assisted Programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 26 will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin, or sex in consideration for an award. The City of Brier reserves the right to reject any or all bids and to waive minor irregularities or informalities and to further make award of the project to the lowest responsive, responsible bidder as it best serves the interest of the City. All Proposals must be accompanied by a certified check, cashiers check, money order, or bid bond payable to the City of Brier and in the amount of not less than 5% of the total bid amount. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The total estimated cost for this project is in the range of $350,000 to $500,000.

Award

Roads / Highways

$801,169.00

Public - City

Paving, Site Work

24

9

6

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
90
Bidding Soon
2,279
All Active Projects
680
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 23, 2024

May 23, 2024

July 4, 2024

img_map_placeholder

Multiple Locations, Brier, WA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.