BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 12, 2024 at 8:00 PM

Updated June 13, 2024

Site work and paving for a sidewalk / parking lot in Diamond, Missouri. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The City of Diamond is accepting bids for construction of a walking trail in Dieckhoff Park. The City of Diamond will accept bids clearly marked City of Diamond Walking Trail. The City of Diamond reserves the right to reject any and/or all bids. Project 1) Construction of an approximately 1,310 liner feet of 6' wide asphalt trail, consisting of asphalt sidewalk typically 2" on top of 4" type 1 aggregated compacted to 95% standard proctor density, extend 6" past edge of sidewalk. The subgrade shall be compacted to 85% standard proctor density. NOTES: 1. All sidewalks are to be built per the current edition of the Missouri Standard Plans for Highway Construction and the City of Battlefield's Design Standards For Public Improvements. 2. Provide control joints at 8' o.c. 3. Provide expansion joints every 100' and 10' on each side of driveways, intersecting walks match points with existing pavements, and locations as shown on plans. 4. Concrete driveways -if cross-slope <2% existing pavement is acceptable as sidewalk. If cross-slope >2% driveway must be sawcut and removed as required to install sidewalk with a maximum 2% cross-slope. Replace to nearest joint unless approved by engineer. 5. Asphalt driveways -install sidewalk across driveway as shown in plan. 6. No sidewalk cross-slope can exceed 2% including sidewalks across driveways. 7. The maximum running slope of sidewalks is <5% if the running slope on a sidewalk not classified as a curb ramp exceeds 5% handrails will be required. 8. The maximum running slope on a sidewalk classified as a curb ramp is 0.33% (7.5% max preferred).

Award

Sidewalks / Parking Lot

$99,049.00

Public - City

Paving, Site Work

4

3

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
1
Bidding Soon
595
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 10, 2024

July 10, 2024

Project location map

N Depot St, Diamond, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.