BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in St Petersburg, Florida. Completed plans call for site work for a water / sewer project.

Deadline for Questions:April 19, 2024, 3:00pm All questions must be submitted via City's online sourcing system's The NEWRF PCCP Replacement is Phase 4 of a series of projects to replace the PCCP transmission main supplied from the Northeast Water Reclamation Facility (NEWRF). The project involves the replacement of approximately 7,000 linear feet of 36" Pre-stressed Concrete Cylinder Pipe (PCCP) installed in 1977 along 77th/78th Avenue North, from 16th Street North to 1st Street North, using Interpace Corporation pipe manufactured with Class IV prestressing wire, which is known to be related to premature pipe failures. The NWWRF PCCP Replacement involves the replacement of ~15,286 linear feet of 30" PCCP reclaimed water main (RWM) supplied by the Northwest Water Reclamation Facility (NWWRF). Like the NEWRF reclaimed water main, the NWWRF main was constructed using Interpace Corporation pipe manufactured with Class IV prestressing wire, which is known to be related to premature pipe failures. The section of the main to be replaced starts at the NWWRF and then runs south through the Azalea Recreation Center and along 72nd Street N., west on 8th Ave. N., South on unimproved right-of-way for 73rd Street N. and then along 73rd Street N., east on 2nd Avenue S. through Circle Park, and east along Poinsettia and 5th Avenues S. to 64th Street S. where it connects to the existing main. The overall project shall be completed by the end of 2028. This Design Criteria Package (DCP) outlines the requirements to successfully complete this critical project for the City. Minimizing impacts to the community, such as noise, odors, dust, and traffic control, is a key component to the project's overall success. Additionally, public outreach and communication during all phases of the project is also essential to the project's success. The City of St. Petersburg ("City") is seeking responses from qualified firms to present Statements of Qualifications to provide Progressive Design Build services for the design, permitting, and construction of the NEWRF and NWWRF PCCP Reclaimed Water Main Replacements. At a minimum, City shall provide and meet the following responsibilities: City shall provide a point of contact (City Project Manager) to administer the Agreement. City Project Manager shall assist with planning, strategy, and objectives prior to performance of the Work. City Project Manager shall promptly respond to issues and inquiries so as not to hinder the progress, completion, or compensation for the Work Scope of Services and Project Phases Upon approval by City Council, the DBF will be authorized to proceed following execution of the Agreement for preconstruction (design and permitting) and construction phase services. It is the City's intent to expedite design and construction of the NEWRF PCCP Replacement and complete it first. Therefore, authorizations are anticipated to include a minimum of four (4) approval phases as follows: o Phase 1: Master Agreement execution and authorization of the Scope of Services and fees for preliminary engineering, 75% design and Guaranteed Maximum Price (GMP) development for the NEWRF PCCP Replacement. o Phase 2: Approval of the GMP for the NEWRF PCCP Replacement, the Scope of Services and fees for final design, permitting and construction of the NEWRF PCCP Replacement, and preliminary engineering for the NWWRF PCCP Replacement. o Phase 3: Approval of the Scope of Services and fees for 75% design and GMP development for the NWWRF PCCP Replacement. o Phase 4: Approval of the GMP for the NWWRF PCCP Replacement and the Scope of Services and fees for final design, permitting and construction of the NWWRF PCCP Replacement. All complaints or grievances should be first submitted in writing to the Procurement & Supply Management Director, by email at Stephanie.Swinson@stpete.org or by mail to P. O. Box 2842, St. Petersburg, FL 33731 who will promptly investigate the validity of the complaint and present the findings in writing to the person who submitted the complaint. Deadline for Questions:April 19, 2024, 3:00pm

Award

Water / Sewer

$100,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
298
Active Projects
131
Bidding Soon
2,308
All Active Projects
892
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 9, 2024

September 9, 2024

img_map_placeholder

Multiple Locations, St Petersburg, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.