BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 13, 2025 at 8:00 PM

Updated September 14, 2025

Site work and paving for a mixed-use development in Oakland Township, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

This Project is for the Construction of the Delaware & Hudson (D&h) Rail Trail in Harmony Township, Susquehanna County in the Commonwealth of Pennsylvania. The Project is a Linear 3.63 Mile Multi-use Trail Project Aligned on the Former D&h Railroad Right-of-way (D&h) Owned (or Eased) for Trail Use by the Rail-trail Council of Nepa. This Trail Section Begins 1.1 Miles South of Melrose Road Along the Former Railroad and Continues North to Rockwell Rd in Stevens Point, Pa. At Rockwell Road, the New Trail Will Connect With an Existing Trailhead and to an Existing Section of the D&h Rail Trail That Extends to the Ny/pa State Border. The Proposed Trail Will Be Fully Ada Accessible From the Trailhead in Stevens Point and, Will Have a 10-foot-wide Crushed Stone Cross Section With 2 - Foot Graded Shoulders That Will Replace the Existing Railroad Ballast / Roadway. The Project Will, for the Most Part, Maintain the Existing Drainage Infrastructure and Rehabilitate the Ditches Associated With the System. Drainage Areas, Flow Patterns, Volumes and Location of Drainage Structures Are Proposed to Remain Unchanged. The Ground Disturbance Associated With the Project Will Primarily Be the Excavation of the Existing Ballast, and the Removal of Soil and Debris in the Existing Drainage Pipes and Ditches to Re-establish Functionality. Suitable Excavated Material Will Be Reused Within the Trail Corridor as Fill and Base Material. All Unsuitable/excess Excavated Material Will Be Properly Disposed of Off-site. Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 00.00% Pre-Bid Meeting: None Anticipated NTP: 12/15/2025 Wage Rates: Yes Required Completion: 01/25/2027 Prequalification Requirement: Yes State Type of Work: Transportation Alternative Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an addendum. The deadline for submitting questions is 72 hours before the let date and time. For emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - Harmony Township Trail Pedestrian Enhancement TASA *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Roads / Highways

$2,500,000.00

Public - State/Provincial

Paving, Site Work

47

13

122

6

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
254
Active Projects
148
Bidding Soon
1,574
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2025

December 10, 2025

Project location map

Multiple Locations, Oakland Township, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.