BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a bridge / tunnel in Walnut, California. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Snow Creek Bridge Reconstruction Project BID PROPOSAL GUARANTY: Each Bid Proposal must be accompanied by cash, cashier's check, certified check or by a bid bond in the amount of ten percent of the bid price payable to the City of Walnut as a guarantee that the bidder, if his bid proposal is accepted, will promptly execute the contract, secure payment of Worker's Compensation Insurance, furnish a satisfactory Faithful Performance Bond in the amount of 100 percent of the total base bid price, and a Labor and Material Bond in the amount of 100 percent of the total base bid price The AGENCY reserves the right to reject any and all bid proposals, to waive any irregularity, and to take all Bid Proposals under advisement for a period of sixty days. TIME OF COMPLETION AND LIQUIDATED DAMAGES: BIDDER must agree to commence work on or before the date of the written "Notice to Proceed" of the AGENCY and to fully complete all work to the satisfaction of the Engineer within sixty (60) working days. BIDDER must agree also to pay as liquidated damages, the sum of five hundred dollars ($500.00) for each working day thereafter as provided in these Specifications. SCOPE OF WORK: Scope of work shall consists of furnishing all labor, materials, equipment, and services in performing all work necessary for and related to the construction of improvements included in the Contract Documents and Specifications, Project Plans, and Bid Item Descriptions that follow. These improvements for various projects shall consist of median extension, pavement repairs, retaining block wall, concrete surfaces, curb, bus shelter, handrail installation and guardrail repairs in accordance with contract documents and specifications, project plans and these Special Provisions.

Award

Bridges / Tunnels

$115,888.00

Public - City

Paving, Site Work

6

5

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
204
Active Projects
103
Bidding Soon
2,223
All Active Projects
998
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2024

June 10, 2024

img_map_placeholder

Snow Creek Dr, Walnut, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.