BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 21, 2024 at 8:00 PM

Updated June 22, 2024

Site work and paving for a mixed-use development in Windsor, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of June 21, 2024, project was awarded to Mountain Constructors Inc. awarded amount is $1,086,168.06.** Reference Number 0000348606 Job Location: Windsor, 11th Street (Sagewood Dr to Greeley No. 2 canal) Road Name: 11th Street Length: 0.46 mi The Work of this Contract consists of road improvements along 11th Street from Greeley No. 2 Canal to Sagewood Drive. The project includes curb extensions, raised medians, turn lane reconstruction, curb ramps and sidewalk, Rectangular Rapid Flashing Beacons (RRFB) and pedestrian signal updates, milling and overlay, and signing and striping. Storm sewer and other utilities impacted by these improvements will be relocated or adjusted. All improvements are detailed in the Contract Documents. The Project is to be completed in 59 working days, with substantial completion prior to the start of the 2024 Windsor school year, and the contractor is made aware of incentives further detailed in the Project Special Provisions. Question Deadline 04/23/2024 at 5:00 PM MT Questions are submitted online Yes, Questions received and answered at the Pre-bid conference and questions received in writing (email) to Scott Pearson are due time, No questions received after this date will be answered unless the bid date is extended by an addendum. The contract goal for participation in this Contract by certified DBEs who have been determined to be underutilized has been established as seven (7%) percent. Buyer Preferences, Guidelines & Requirements Participation Requirements - Disadvantaged Business Enterprise (DBE) General Requirements - Federally Funded - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Labor and Materials Bond 100 % - Payment Bond 100 % No Bid may be withdrawn for the period of time after the date Bids are opened which is specified in the Bid Form. Owner reserves the right to reject any or all Bids, to waive any informalities or irregularities therein, and to reject nonconforming, non-responsive, or conditional bids. The decision of the Owner shall be final.

Under Construction

Roads / Highways

$1,086,168.00

Public - City

Paving, Site Work

80

5

2

5

Subscribe For Documents

81 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
195
Active Projects
66
Bidding Soon
1,309
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2024

June 3, 2024

Project location map

11th St, Windsor, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.