BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 15, 2024 at 8:00 PM

Updated June 16, 2024

Site work for a water / sewer project in Las Vegas, Nevada. Completed plans call for site work for a water / sewer project.

The installation of approximately 11,400 linear feet of cured-in-place pipe (CIPP)within existing gravity sewer pipelines ranging in size from 6-inches to 18-inches; removal and replacement of approximately 27,400 linear feet of gravity sewer pipelines ranging in size from 6-inches to 18-inches; installation or trenchless pipe repair sleeves; removal or abandonment of sewer manholes; installation of sewer manholes; and rehabilitation of sewer manholes. This work also includes open cut spot repairs of sewer lines, trenchless spot repairs of sewer lines; relocation of water main pipelines and laterals; sewer lateral connections; removal/replacement/restoration of bituminous concrete pavement, sidewalk, curb, gutter, landscaping, fences & walls; traffic control; dewatering; bypass pumping; and all other appurtenant work required to rehabilitate sewer pipelines and sewer manholes. The Engineer's estimate is in the $38,300,00.00 to $44,700,000.00 range. Question Deadline 4/30/2024 05:00:00 PM (PT) All questions concerning licensing and limits should be directed to the Nevada State Contractors Board *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Water / Sewer

$45,489,893.00

Public - County

Site Work

519

63

10

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
31
Bidding Soon
329
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2024

August 5, 2024

Project location map

Multiple Locations, Las Vegas, NV


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.