BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 15, 2024 at 8:00 PM

Updated July 3, 2025

Site work for a civil project in Reno, Nevada. Completed plans call for site work for a road / highway; and water / sewer project.

Estimated Bid Value $1,200,000 - $1,500,000 Q&A Deadline 04/19/2024 5:00 PM (PDT) Grading and reshaping the Chalk Creek Channel, installation of riprap on channel banks and bottom, revegetation, traffic control, public relation activities, and miscellaneous work outlined in the plans and specifications to establish a more naturally functioning stream and riparian corridor and improve channel flood capacities while working within the site constraints imposed by the urban setting. Repairs shall be performed in compliance with all regulatory agency permits. Said Proposal shall include all labor, tools, implements, machinery, materials, and any incidentals necessary to complete the work in the manner and time prescribed, and in strict conformity with the Contract Documents to the satisfaction of the City Engineer. In general, the major work items include: Grading and reshaping the Chalk Creek Channel, installation of riprap on channel banks and bottom, revegetation, traffic control, public relation activities, and miscellaneous work outlined in the plans and specifications to establish a more naturally functioning stream and riparian corridor and improve channel flood capacities while working within the site constraints imposed by the urban setting. Repairs shall be performed in compliance with all regulatory agency permits. The Bidders attention is directed to Nevada Revised Statutes 338.01165 setting forth the requirements for the use of apprentices on public works which requires a contractor or subcontractor to comply with certain requirements relating to the use of apprentices on public works. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Liquidated Damages $1000/day for exceeded overall work days, $5,000/day for each day Phase 1 Project Duration 90 working days Bid Bond 5.00% Payment Bond 100.00% Performance Bond 100.00%

Award

Water / Sewer

$689,389.00

Public - City

Site Work

22

16

2

6

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
23
Bidding Soon
390
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.