BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a development in Monument, Colorado. Completed plans call for the renovation of a development.

Revision #2 5/23/2024, adding site visit sign in sheet to attachments. SCOPE OF CONTRACT The project scope of work includes, but is not limited to, the following: i. Mobilization. ii. Quality control, survey, and staking. iii. Remove, replace, relocate, and upgrade of copper and fiber optic cabling and associated equipment, devices, and appurtenances associated with communication systems; relocation of communication equipment to new telecommunication room; remove and reinstall ceiling tiles to permit telecom installation; remove and install new electrical panel and associated conductors and conduit; remove overhead masts and patch roof; trenching, backfilling, and aggregate base course replacement; installation of underground conduit and associated conductors and innerducts for underground power and telecommunication service; demolition of existing telecommunication room and installation of new walls, gypsum board, and painting. iv. Coordination with telecommunication and electric providers for removal of overhead services and connection of new underground service. v. Construction includes furnishing all labor, materials, equipment, tools, transportation, supplies, storage, other incidentals and all work required to complete the proposed addition, remodel and associated items in accordance with the approved final drawings, specifications and provisions of the contract. vi. Construction quality control includes supplying all the personnel, equipment, tests and reports necessary to ensure that construction is completed in compliance with the drawings, specifications and provisions of the contract. Materials testing and inspection agency shall be a separate entity from the Contractor. vii. Refer to project plans and specifications for more information and requirements. o Monument Work Center Telecom Upgrade, Specifications, dated April 2020. o Monument Work Center Telecom Upgrade, Construction Plans, dated February 2020. viii. Due to the historic nature of the existing buildings no new or enlarged penetrations will be allowed. Any new utility work will go underground/underfloor, through the attic, or utilize existing exterior penetrations. The project is located at the Monument Fire Center on the Pike National Forest, Pikes Peak Ranger District in El Paso County, Colorado, approximately 3 miles west of Monument, Colorado. Address: 3751 Mt. Herman Road, Monument, CO 80132 i. On-site mobilization shall not occur prior to June 3, 2024. ii. Construction shall be completed by April 30, 2025. In accordance with FAR 36.204 (d), the estimated magnitude for this project is between $250,000 and $500,000. All questions about the solicitation or resulting from the site visit shall be submitted via email to Tony Taylor at tony.taylor@usda.gov no later than May 10, 2024, by 2:00 p.m. MT. Questions will be answered and posted to the solicitation on SAM.gov. Answers to questions are expected to be posted within three (3) business days after the question due date and time. No questions will be entertained in person at the site visit. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Conservation and Development

$282,980.00

Public - Federal

Renovation

12

15

2

5

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
38
Bidding Soon
868
All Active Projects
372
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2024

June 17, 2024

img_map_placeholder

3751 Mt Herman Rd, Monument, CO

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.