EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 13, 2024 at 8:00 PM

Updated May 16, 2024

Renovation of a municipal facility in Kansas City, Kansas. Completed plans call for the renovation of a municipal facility.

Question Deadline 05/09/2024 at 5:00 PM CT Green Infrastructure Project Contract Time: 12/31/2024 Estimated Value: $7,000,000 - $10,000,000 Project goals for MBE and WBE participation are not part of this solicitation. Trade goals for MBE and WBE participation are part of this solicitation (See Instructions and Information to Bidders Paragraph 31). This project is funded by the Water Infrastructure Finance and Innovation Act (WIFIA) and Davis-Bacon applies. The Build America, Buy America (BABA) is waived because design began before May 14, 2022. Please direct all questions to Kristina Blevins at kblevins@wycokck.org *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Work to be performed under these Contract Documents is generally described as follows: 1. The Work includes separation of wet weather flows from the existing combined sewer system, including construction of new storm sewer and appurtenances, and the installation of green stormwater infrastructure located within the project boundary of Armstrong Avenue to the north, N. 8th Street to the east, Barnett Avenue to the south, and N. 9th Street to the west in Kansas City, Kansas. 2. The proposed system improvements generally include modification of the combined sewer system inlets and construction of new storm sewer. The green infrastructure improvements at the park include an underground storage system and a terraced wet detention basin. In general, the Work includes but is not limited to the following: a. Installation of erosion and sediment controls for duration of construction b. Abandonment and demolition of existing sewer manholes, inlets, and other drainage structures c. Demolition of existing curb and sidewalk d. Installation of new storm sewer piping, inlets, manholes and other drainage structures e. Demolition of structures within project boundary for installation of green infrastructure f. Excavation for new green stormwater infrastructure devices, new stormwater drainage piping and new stormwater control structures g. Installation of new stormwater drainage piping and manholes to convey drainage to the new green stormwater infrastructure devices h. Connect new stormwater drainage piping to existing manholes and patch existing penetrations for piping removed from existing manholes i. Connect new stormwater sewer to existing combined sewer system j. Installation of new curb inlets and trench drains to convey stormwater from adjacent roadways to new green stormwater infrastructure devices k. Installation of new high infiltration soil media, stone, and sand layers within the green stormwater infrastructure devices l. Installation of new cleanouts, underdrain, and overflow piping m. Restoration of sidewalk and curbing n. Restoration of asphalt pavement o. Restoration of landscaped surfaces

Post-Bid

Municipal

$10,000,000.00

Public - County

Renovation

41

15

22

7

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Other Specialties, Scales
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics, Furnishings and Accessories, Bedroom Furnishings, Blankets, Furniture, Residential Furniture, Beds
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts, Other Conveying Equipment, Facility Chutes
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Concrete Overlays, Operation and Maintenance of Planting, Fertilizing, Pruning, Watering, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Retaining Walls, Planting, Turf and Grasses, Seeding, Sodding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
31
Bidding Soon
626
All Active Projects
262
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2024

July 15, 2024

img_map_placeholder

To Be Determined, Kansas City, KS

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.