Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and outdoor lighting for a mixed-use development in Normal, Illinois. Completed plans call for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; sidewalk / parking lot; and sidewalk / parking lot.
The existing Bloomer Line segment of the Constitution Trail between the Connie Link Amphitheater and Underwood Park is heavily used during theater events and performances. Two event parking areas are located within Underwood Park and theatre patrons will utilize this segment of the Constitution Trail to and from the amphitheater. The placement of lighting along this segment of the trail will help enable safe night use. The project will involve the installation of three pole lights that will help to improve visibility, increase trail convenience, and give trail users a sense of security while passing through at night. The trail segment is separated by a pedestrian bridge at Linden Street. The approximate location of the three pole lights have been predetermined. One pole light will be installed west of the bridge, between the Connie Link Amphitheatre and the Linden Street Bridge. The other two light poles will be installed on the east side of the bridge, between the Underwood Park trailhead parking lot and the Linden Street Bridge. Deadline for written inquiries Monday, April 22, 2024 Contract award Monday, May 6, 2024 This project consists of the installation of three pole lights on the Blooming Line of the Constitution Trail between Connie Link Amphitheater and the Underwood Park trailhead parking lot. The addition of trail light will help to improve visibility, increase trail convenience, and give trail users a sense of security while passing through at night. The Town of Normal reserves the right to reject any or all bids received. The bid award will be made by the Town Council and their decision will be final.
Post-Bid
Playgrounds / Parks / Athletic Fields
$4,242,000.00
Public - City
Outdoor Lighting, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 25, 2024
June 24, 2024
Multiple Locations, Normal, IL
Related To This Project
Normal, IL
Bid Date: May 16 2024
Normal, IL
Bid Date: May 09 2024
Normal, IL
--
Normal, IL
--
Normal, IL
--
Normal, IL
--
Normal, IL
Bid Date: May 02 2024
Normal, IL
--
Normal, IL
Bid Date: Apr 15 2024
Normal, IL
Bid Date: Apr 30 2024
Normal, IL
Bid Date: Apr 03 2024
Normal, IL
Bid Date: May 24 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.