BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 18, 2024 at 8:00 PM

Updated June 19, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Sacred Heart, Minnesota. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Project Description: Bridge # 65573 - CSAH 12 Construction Location: On CSAH 12, Over Chetemba Creek, 15, T-116N, R-37W, 6.5 miles N.E. of Sacred Heart, MN. Bridge Replacement (old 65504, New 65573) Concrete Slab Span and approach grading Approximate major items of work are: 751 CY Excavation-Common 3545 CY Common Embankment 1689 Ton Aggregate Base Class-5 200 LF Type S (TL-4) Barrier Concrete 63,160 Lbs Reinforcement Bars (Epoxy Coated) 3,900 SF Bridge Slab Concrete (3HYPC-M) 270 LF CIP Concrete Piling 12" 360 LF CIP Concrete Piling 12" 735 Ton Random Riprap Class III Each bid shall be accompanied by a bidder's bond naming the County of Renville as obligee, or certified check payable to the Auditor/Treasurer of Renville County equal to at least five percent (5%) of the amount of the bid, which shall be forfeited to the County in the event that the bidder fails to enter into a contract. This Project has a Disadvantaged Business Enterprises (DBE) goal. See the DBE Special Provisions for requirements. Expected Award Date:05/14/2024 Project Start Date:06/17/2024 Construction Start Date:06/17/2024 Construction End Date:09/30/2024

Award

Bridges / Tunnels

$1,464,838.00

Public - County

Demolition, New Construction, Paving, Site Work

55

5

5

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
12
Bidding Soon
360
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2024

June 20, 2024

Project location map

CSAH 12, Sacred Heart, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.