Published June 20, 2025 at 8:00 PM

Updated June 21, 2025

Site work for a water / sewer project in Keene, New Hampshire. Completed plans call for site work for a water / sewer project.

The Island Street infrastructure project proposes replacement of underground utilities including: 1,420 feet of water main; 2,580 feet of sewer main; 1,450 feet of storm drainage piping; 1,420 square yards of 4 and 8-inch sidewalks and base; 2,380 feet of granite curbing; road reconstruction including more than 3,500 cubic yards of base gravels and 1,500 tons of asphalt pavement. Project scope: Excavation/ removal of asphalt (8,350 SY), concrete road (4,500 SY) & sidewalk (70SY). Importing/ rehandling, placement, compaction & maintenance oftemporary road gravels. Underground utility construction: Storm drain (1,480 LF), sanitary sewer (2,620 LF), water mains (1,470 LF) including installation, alteration, and adjustment ofutility structures. Road base construction (+/- 3,500 CY). Install/ reset vertical granite curb (+/- 2,400 LF). Concrete sidewalk (+/- 1,450 SY) & base gravel (525 CY). Asphalt paving (+/-1,575 Tons). Pavement markings, install/ relocate/ remove signs, signal coordination. Maintenace ofTraffic: Traffic and detour plan, signage, flaggers, barriers, dust control. Bid Add Alternate #1 Traffic Signal Construction Contingency $200,000; Emulsified Asphalt Adjustment $7,500 Questions regarding this project shall be directed to Purchasing & Contract Services Manager, in writing, via the current project database (https://keenenh.gov/finance-purchasing/current-projects). The proposed improvements, hereinafter called the Work, is located on Island Street from the Ashuelot River bridge to West Street. Excavation to include removal of concrete roadway and asphalt surfaces, uncovering utility structures, test pits, and removal ofunsuitable material. Construction of +/- 1,450 L.F. of 12"-24" drain pipe and fourteen precast concrete catch basins. Construction of +/- 2,580 L.F. of 6 and 8-inch PVC sewer, including eight precast concrete manholes, and multiple 6-inch sewer service connections. Construction of a temporary water system and +/- 1,420 L.F. of 6',-16',-inch ductile iron watermain, fire hydrants, domestic and fire service connections. Coordination with Liberty Utilities for the replacement of gas mains (by others) following removal ofthe concrete road. Reconstruction, replacement, or grade adjustment of utility surface structures, including protection ofwork and maintaining road access through all phases ofthe project. Preparation and construction of +/- 3,500 C.Y. of base gravel, and +/- 1,500 Tons of asphalt binder and wear courses. 8. Preparation and construction of +/- 2,380 L.F. of vertical granite curbing and +/- 1,420 S.Y. of 4" and 8" concrete sidewalks with detectable warning panels. 9. Retro-reflective paint pavement markings, landscape grading, signage, or other incidentals included in the plans and details. 10. Bid Add Alternate #1 includes replacement of traffic signal at West and Island Streets, associated underground electrical conduit, pull boxes, signage and appurtenances.

Bid Results

Water / Sewer

$3,257,390.00

Public - City

Site Work

27

22

4

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
521
Active Projects
246
Bidding Soon
3,939
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2025

July 14, 2025

Project location map

Island St, Keene, NH


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.