Site work for a water / sewer project in Keene, New Hampshire. Completed plans call for site work for a water / sewer project.
The Island Street infrastructure project proposes replacement of underground utilities including: 1,420 feet of water main; 2,580 feet of sewer main; 1,450 feet of storm drainage piping; 1,420 square yards of 4 and 8-inch sidewalks and base; 2,380 feet of granite curbing; road reconstruction including more than 3,500 cubic yards of base gravels and 1,500 tons of asphalt pavement. Project scope: Excavation/ removal of asphalt (8,350 SY), concrete road (4,500 SY) & sidewalk (70SY). Importing/ rehandling, placement, compaction & maintenance oftemporary road gravels. Underground utility construction: Storm drain (1,480 LF), sanitary sewer (2,620 LF), water mains (1,470 LF) including installation, alteration, and adjustment ofutility structures. Road base construction (+/- 3,500 CY). Install/ reset vertical granite curb (+/- 2,400 LF). Concrete sidewalk (+/- 1,450 SY) & base gravel (525 CY). Asphalt paving (+/-1,575 Tons). Pavement markings, install/ relocate/ remove signs, signal coordination. Maintenace ofTraffic: Traffic and detour plan, signage, flaggers, barriers, dust control. Bid Add Alternate #1 Traffic Signal Construction Contingency $200,000; Emulsified Asphalt Adjustment $7,500 Questions regarding this project shall be directed to Purchasing & Contract Services Manager, in writing, via the current project database (https://keenenh.gov/finance-purchasing/current-projects). The proposed improvements, hereinafter called the Work, is located on Island Street from the Ashuelot River bridge to West Street. Excavation to include removal of concrete roadway and asphalt surfaces, uncovering utility structures, test pits, and removal ofunsuitable material. Construction of +/- 1,450 L.F. of 12"-24" drain pipe and fourteen precast concrete catch basins. Construction of +/- 2,580 L.F. of 6 and 8-inch PVC sewer, including eight precast concrete manholes, and multiple 6-inch sewer service connections. Construction of a temporary water system and +/- 1,420 L.F. of 6',-16',-inch ductile iron watermain, fire hydrants, domestic and fire service connections. Coordination with Liberty Utilities for the replacement of gas mains (by others) following removal ofthe concrete road. Reconstruction, replacement, or grade adjustment of utility surface structures, including protection ofwork and maintaining road access through all phases ofthe project. Preparation and construction of +/- 3,500 C.Y. of base gravel, and +/- 1,500 Tons of asphalt binder and wear courses. 8. Preparation and construction of +/- 2,380 L.F. of vertical granite curbing and +/- 1,420 S.Y. of 4" and 8" concrete sidewalks with detectable warning panels. 9. Retro-reflective paint pavement markings, landscape grading, signage, or other incidentals included in the plans and details. 10. Bid Add Alternate #1 includes replacement of traffic signal at West and Island Streets, associated underground electrical conduit, pull boxes, signage and appurtenances.
Bid Results
Water / Sewer
$3,257,390.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 15, 2025
July 14, 2025
Island St, Keene, NH
Related To This Project
Keene, NH
Bid Date: Jun 04 2024
Keene, NH
Bid Date: May 10 2024
Keene, NH
Bid Date: Jun 12 2024
Keene, NH
Bid Date: Oct 31 2024
Keene, NH
Bid Date: Jul 12 2024
Keene, NH
Bid Date: Jul 19 2024
Keene, NH
Bid Date: Jul 22 2024
Keene, NH
Bid Date: Apr 25 2024
Keene, NH
Bid Date: May 03 2024
Keene, NH
Bid Date: Apr 09 2024
Keene, NH
Bid Date: May 28 2024
Keene, NH
Bid Date: Apr 09 2024
Keene, NH
Bid Date: Jul 30 2024
Keene, NH
Bid Date: Mar 21 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.