Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 30, 2024 at 8:00 PM
Updated May 31, 2024
Renovation of a library in Gurnee, Illinois. Completed plans call for the renovation of a library.
Boiler Tube Replacement RFP The Warren-Newport Public Library District All inquiries must be in writing. Such written inquiries will be sent to the above email address. Response to such inquiries will be in writing. No inquiries will be accepted after 12:00 pm CST, Monday, April 29 Scope of Work 1. Remove inner and outer tube access panels from the Penthouse Bryan boiler 2. Pull all tubes from the boiler, remove from building, and dispose of per customers direction 3. Flush out upper and lower drums of loose debris and sludge 4. Burnish tube holes and clean with flap wheels 5. Furnish new set of boiler tubes and burnish tube ends 6. Tuckpoint firebox and upper tube walls, or if in bad condition, inform customer and present repair options. Upon decision: 7. Install new tubes using manufacturer's recommended sealant applied on tube ends 8. Fill and test boiler at operating pressure 9. Apply new fireside gasket material to inner panel and install 10. Reinstall outer tube access panel 11. Furnish at least 1-year parts and labor warranty
Award
Library
$30,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 6, 2024
June 5, 2024
To Be Determined, Gurnee, IL
Related To This Project
Gurnee, IL
Bid Date: May 01 2024
Gurnee, IL
Bid Date: May 14 2024
Gurnee, IL
Bid Date: May 13 2024
Gurnee, IL
Bid Date: Mar 05 2021
Gurnee, IL
Bid Date: Jun 27 2024
Gurnee, IL
Bid Date: Jun 10 2024
Gurnee, IL
Bid Date: Jun 10 2024
Gurnee, IL
--
Gurnee, IL
Bid Date: Apr 08 2024
Gurnee, IL
Bid Date: Apr 22 2024
Gurnee, IL
Bid Date: Apr 08 2024
Gurnee, IL
Bid Date: Apr 08 2024
Gurnee, IL
Bid Date: Apr 25 2024
Gurnee, IL
Bid Date: Apr 25 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
