BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and outdoor lighting for a mixed-use development in Rochester, New York. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; and for outdoor lighting for a playground / park / athletic field.

Reference Number 0000349237 Project Estimate: $5,092,734.00 Contract E - Electrical Construction: LaBella Electrical contract consists of a complete removal of the existing system including an overhead service connection from RG&E that delivers 120/240V, 1Ph-3W power to an existing, unlabeled panelboard through a utility revenue meter mounted to the exterior of the building. All outlets, lighting (exterior and interior), power connections, data, and emergency fixtures will be removed. New work will consist of a new 480/277, three-phase, four wire configuration with a new main breaker and new distribution panels. Coordination with RGE on a new transformer pad and distribution wiring will be provided for the new service. New security, lighting, power, outlets, and data will be provided to the space. New distribution power to all HVAC, Plumbing, and Architectural needs will be provided. New site lighting for the parking lot and park will be provided. A new fire alarm system will be provided. To achieve carbon neutrality for the building, an array of solar panels will be installed to generate energy and offset consumption at the facility. The main roof will consist of solar panels spanning the roof, bidirectional meter, racking, inverter, and accessories to achieve a solar system. All solar work must be complete by a NY Sun certified subcontractor. Building commissioning services will be part of this project and will need to be supported by this contract. REQUIREMENTS: This Contract Contains an Incentive Program for Employing Qualified City Residents, Apprenticeship Program and waiver requirements; MWBE goals and waiver requirements; and Workforce Goals Requirements Participation Requirements - Minority Business Participation - Women-Owned Business Participation General Requirements - Bid Deposit Required - Certified Payroll - Insurance Required - Prevailing Wage Required This contract contains new requirements for NY State Wicks Law. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Labor and Materials Bond 100 %

Post-Bid

Playgrounds / Parks / Athletic Fields

$5,092,734.00

Public - City

Outdoor Lighting, Site Work

129

37

55

5

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
67
Bidding Soon
1,273
All Active Projects
651
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2024

July 22, 2024

img_map_placeholder

107 Bridge View Dr, Rochester, NY

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.