BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a service station / car wash facility in Tumwater, Washington. Completed plans call for site work for a service station / car wash facility.

**As of May 31, 2024 project was awarded but awarded amount is not available.** The City of Tumwater ("City") is requesting quotes for the purpose of installing Level 2 Electric Vehicle (EV) charging stations for the City Fleet. The City's needs are outlined in the following Request for Quotes ("RFQ"). This project includes the design, engineering, permitting, installation, commissioning, and additional stub-outs for Level 2 EV charging stations for City of Tumwater Fleet use. This project intends to install 10 Level 2 charge ports (to be supplied by the City of Tumwater, Blink Series 7 Plug Dual-Port) and stub out for 3 additional Level 2 ports to be installed at a later date. Specifically, those chargers, stub outs, and work locations Deadline for Questions: 12:00 Noon, May 3, 2024. All questions and final quotes shall be sent by email to: Alyssa Jones Wood, Sustainability Coordinator ajoneswood@ci.Tumwater.wa.us (360) 754- 4140 Quotes should be prepared simply and economically, providing a straightforward, concise description of provider capabilities to satisfy the requirements of the request. Special bindings, colored displays, promotional materials, etc., are not desired. Emphasis should be on completeness and clarity of content. Use of recycled paper for requests and any printed or photocopied material created pursuant to a contract with the City is desirable whenever practicable. Use of both sides of paper sheets for any submittals to the City is desirable whenever practicable. The Sustainability Coordinator will notify the contractor selected by May 6, 2024. All quotes must include the following information: Examples of your firm's experience installing EV chargers. A proposed outline of tasks, products and project schedule, including the number of hours required to complete each task or product. A proposed budget based on the above outline of tasks, products and schedules. Responsiveness of the written proposal to the purpose and scope of work. 25% Price. 50% Ability and history of successfully completing contracts of this type. 25% Total Criteria Weight 100% Each quote will be independently evaluated on factors a through c. TERMS AND CONDITIONS. The City reserves the right to reject any and all quotes, and to waive minor irregularities in any quote. The City reserves the right to request clarification of information submitted, and to request additional information from the contractor. The City reserves the right to award the contract to the next most qualified contractor, if the successful contractor does not execute a contract within thirty (30) days after the award of the quote. Any quote may be withdrawn up until the date and time set above for opening of the quotes. Any quote not so timely withdrawn shall constitute an irrevocable offer, for a period of ninety (90) days to sell to the City the services described in the attached specifications, or until one or more of the quotes have been approved by the City administration, whichever occurs first. The contract resulting from acceptance of a quote by the City shall be in a form supplied or approved by the City and shall reflect the specifications in this RFQ. A copy of the contract is available for review. The City reserves the right to reject any proposed agreement or contract that does not conform to the specifications contained in this RFQ, and which is not approved by the City Attorney's office. The City shall not be responsible for any costs incurred by the contractor in preparing, submitting or presenting its response to the RFQ. Installation must be carried out by someone with a contractor's license, electrician certification, and City of Tumwater Business License. All labor performed must adhere to prevailing wage requirements and provide satisfactory documentation. Additionally, at least 15% of the electrical crew per site must be apprentices. Installation quotes must also include: The contractor applying for and managing all necessary permits and inspections; Painting, striping, and installing signage for parking spaces; Restoration of site, which may include trenching, repaving, or replacing landscaping; and Applicable sales tax (9.7%). Contractors may also choose to include installing overhead LED lighting at the charging station locations as an optional service in their submitted quote. This should be clearly noted on the bid sheet (see example bid sheet at the end of this document). Work on this project is expected to commence in late Summer 2024 and be completed within 6 months after work begins. Exact start and end dates depend on the City's execution of an agreement with the WA Department of Commerce for the grant funding this work. COMPENSATION Please present detailed information on the contractor's proposed quote for the specifications proposed and for any variation for non-routine services, inclusive of Washington state sales tax and any other applicable governmental charges. Please provide specifics as to definitions of routine versus non-routine tasks, what is fixed as opposed to variable, and how costs are adjusted according to that classification. Payment by the City for the services will only be made after the services have been performed, an itemized billing statement is submitted in the form specified by the City, and approved by the appropriate City representative, which shall specifically set forth the services performed, the name of the person performing such services, and the hourly labor charge rate for such person. Payment shall be made on a monthly basis, thirty (30) days after receipt of such billing statement. Affirm: If selected, at least 15% of crew assigned to this job will be apprentices. This quote was created utilizing prevailing wage rates. If selected, this job will adhere to prevailing wage requirements and reporting. This project can be completed within 6 months of an executed contract with the selected contractor. References for previous EV charger installation jobs (include short description of job, name of customer, and email address) Point of Contact: ajoneswood@ci.tumwater.wa.us

Award

Service Station / Car Wash

$300,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
26
Bidding Soon
649
All Active Projects
277
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2024

September 3, 2024

img_map_placeholder

Multiple Locations, Tumwater, WA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.