EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 4, 2024 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Clarendon Hills, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and road / highway.

**As of June 4, 2024, project was awarded to SCHROEDER ASPHALT SERVICES, INC., awarded amount is $842,430.85.** The proposed work is officially known as the 2024 ROAD PROGRAM and further described as a resurfacing project. The work to be performed consists of PCC Sidewalk, Curb and Gutter, Driveway Removal and Replacement, HMA Surface Removal, HMA Binder Course, HMA Surface Course, Structure Adjustment and Reconstruction, Parkway Restoration, and all incidental and collateral work necessary to complete the improvement as shown and described in the contract. Pre-Qualification: Yes Site Directions: o Resurfacing of the following streets and parking lots: o Holmes Avenue from 55th Street to 58th Street (approximately 2,600 linear feet) o 58th Street from Holmes Avenue to Route 53 (approximately 900 linear feet) o 56th Street from Barclay Court to Forest Hills Drive (approximately 950 linear feet) o 226 Middaugh (Maple Metering Station Parking Lot) o 1 N. Prospect Avenue (Village Hall Parking Lot) o 231 Burlington Avenue (Water Tower Parking Lot) o 4 McIntosh (McIntosh Alley) o 259 Ann Street (Ann Street Metering Station Parking Lot) o 261 Ann Street (Reservoir Parking Lot) o 50 Sheridan (Historical Society Parking Lot) o 278 Holmes Avenue (Well #6 Parking Lot)

Award

Roads / Highways

$842,431.00

Public - City

Paving, Site Work

3

9

17

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Watering, Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Turf and Grasses, Sodding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
178
Active Projects
98
Bidding Soon
2,237
All Active Projects
957
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2024

June 10, 2024

img_map_placeholder

Multiple Locations, Clarendon Hills, IL

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

2024 Road Program

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.