Renovation of a residential development in Centralia, Illinois. Completed plans call for the renovation of a residential development.

Repair rear right gutter Reattach gutter by front door. Apartment 16 Repair/Reattach front and back gutter. Community Room Building Repair/Reattach front right side gutter. Apartment 18 Reattach gutter by front room window. Replace Front Perch gutter. Replace left side gutter from the Front Porch to the corner of the building. Replace Front Porch gutter. Replace rear gutter Community Room Building Front right by maintenance doors needs repaired,.. Apartment 6 A 7 Front seam needs repaired. Back seam needs repaired. Apartment 11 Reattach the rear left end. Apartment 13 Front right needs reattached. Check for ail loose pieces. Apartment 14 a 15 Rear seam needs repaired. Repair/Reatiach front left gutter by down spout. Community room, north side of the building by the gas regulator, replace a section of damaged Downspout. Match existing size. If any unknown issues arise during the performance of work, and issues need to be addressed in order for work to be completed in a satisfactory manner, please notify MCHA immediately to address the issue Contractor shell be responsible for all repairs to damage of building(s), drives, fences, landscaping, etc. caused by their employees or vendors during the work process. All repairs shall be made to owner's satisfaction at contractor's expense. If the condition is not remedied to the satisfaction of MCHA, liquidated damages in an amount equal to the expense to restore the condition acceptable to MCHA will be assessed against the contractor as a deduct from the contract price. AH proposals must be received by toe date/time mentioned above in orderto be considered. Proposals can be delivered via e-mail to or hand delivered/drop boxed fa MCHA at 719 E Howard, Centralia, IL. << Please reference the Project # when submitting a proposal. o For questions regarding the Scope of Work, please contact Kenneth Shelton at or by railing the MCHA office 618-532-1894. Contractor to provide pricing for acceptable finished guttering work (through repair, replacement or adding new) that meets the following criteria; Marion County Housing Authority 71S E Howard St. PO Box SS9 Centralia, fl GZSdl 61B.5B2-1S94 >> Buildings to have 5" seamfess gutters with at least 4" downspouts. << Use two straps (per standard recommendation) per downspout. Straps can be wrap around or side mount but should have a factor/ finished edge (no sharp, unfinished edges from trimming). o Downspouts are to be four inches with elbows at the bottom to divert water away from the building. Downspout length with elbow is to extend to within four inches of grade level and must be plumb. << For buildings that have downspout drain lines, the downspout will have to be attached to the drain pipe with a correct size transition and as close tu ground level as possible (some drain pipes may need to he cut down) >> Gutter should be instated behind drip edge. >> Glitters with the length of more than 40 feet or more are to be split into equal lengths with an expansion joint. Cap both ends and leave a % inch gap between the top edges of the end caps. Additionally, secure a small piece of white aluminum over the gap to direct rainwater Into either gutter o Examine the fascia material to make sure it extends up under the drip edge. If it doesn't and there is bare wood exposed then ws need to discuss options on repairing or replacing. One option would be to use Flashing material and slide it under the drip edge while overlapping the fascia material. o Hangers should be installed and secured with no mure than 36 inches distance between hangers. << Gutters, downspouts, straps and drain line transition pieces all to be white in color. o Gutters should extend >V' to 'M" beyond the shingles at the end ofevery gutter run. (R) Gutter guards should be quoted as

Post-Bid

Residential Subdivision

$360,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
54
Bidding Soon
628
All Active Projects
261
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2024

May 30, 2024

img_map_placeholder

Multiple Locations, Centralia, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.