BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 4, 2025 at 7:00 PM

Updated March 5, 2025

Site work and new construction of an educational facility in Centralia, Illinois. Completed plans call for the construction of a 29,000-square-foot educational facility; and for site work for a educational facility.

Construct new 29,000 square foot slab on grade addition consisting of new gymnasium, restrooms, locker rooms, support spaces, and interior renovations. New addition to be constructed with structural precast, masonry veneer, metal wall panels, membrane roofing, and aluminum storefronts. Interior construction to consist of masonry, metal stud framing, drywall, acoustical ceilings, wood gym flooring, bleachers and resilient flooring. Project also includes renovation of existing spaces in the Fitness Center. Location 27210 College Road, Centralia, IL 62801 Bidders will be required to provide Bid Security of a sum no less than tan percent (10%) of the Bid Sum. The bid security shall be a certified check, cashier's check, bank money onder or bid bond issued by sursty licensed to conduct business in the State of lillinois. Hereinafter this bid security shall be referred to as the bid bond Bids will be required to be submitted under a condition of irrevocability for a period of 60 days after submission, This project is subject to the lilinois Prevailing Wage Act for Clinton County, IL Do not indude sales taxes in the bids, as Kaskaskie College is sales tax exempt. The Owner riserves the right to accept or reject any or all bids, to waive any informalities and irregularities in any bid, or to make awards in the best interests of the Owner ASPIRATIONAL GOALS: The MBE/WBE/DBE aspirational goal for this contract is (30%) of the amount of the contract award. This should consist of 16% MBE, 10% WBE, and 4% DBE. The VBE aspirational goal for this contract is (0%) of the amount of the contract award. Question Deadline 08/05/2024 at 5:00 PM CT Latest Time to Submit Request for Interpretation: Questions shall be directed to: Courtney Huels, Project Manager chuels@poettkerconstruction.com Bid Result General Trades - Holland - $ 2,070,000 Concrete - JB Esker - $ 880,000 Pre-Cast Concrete - Mid America Precast - $ 858,512 Masonry - Gass - 635,792 Structural Steel - Federal - 890,200 Roofing & Sheet Metal - Joiner Sheet Metal - 598,000 *This project has been awarded and all trades have been let.

Award

Educational

$5,932,504.00

Public - State/Provincial

New Construction, Site Work

97

28

2

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
178
Active Projects
90
Bidding Soon
1,200
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 8, 2024

October 7, 2024

Project location map

27210 College Rd, Centralia, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.