EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 23, 2024 at 8:00 PM

Updated October 1, 2024

Site work and paving for a sidewalk / parking lot in South Elgin, Illinois. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

2024 Sidewalk, Driveway Apron & Curb Replacement Project:- PCC SIDEWALK REMOVAL & REPLACEMENT 5" PCC SIDEWALK REMOVAL & REPLACEMENT 6" PCC APRON REMOVAL & REPLACEMENT 6" CURB REMOVAL & REPLACEMENT DESCRIPTION: This work shall consist of removing and replacing PCC concrete curb, sidewalk or other flatwork. This work will be done in accordance with IDOT Sections 423, 424 and 440 of the Standard Specifications and consistent with attachment A & B of this document. The sub-base, after the removal is complete, will be regraded and/or compacted before pouring the PCC and this work shall be included in the unit price for each of the above items. PAVEMENT PATCHING: DESCRIPTION: This work will consist of removing and replacing pavement where concrete meets the road consistent with a class D patch IDOT section 442 will apply. Substantial Completion July 1, 2024 Final Completion July 15, 2024

Award

Sidewalks / Parking Lot

$99,101.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
247
Active Projects
157
Bidding Soon
2,569
All Active Projects
1,067
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2024

June 13, 2024

img_map_placeholder

Multiple Locations, South Elgin, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2024 Sidewalk, Driveway Apron & Curb Replacement Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.