BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 23, 2025 at 8:00 PM

Updated September 24, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Las Cruces, New Mexico. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

https://www.lascrucesbulletin.com/stories/bridge-rehabilitation-project-on-i-10-over-university-ave-begins,94382 The New Mexico Department of Transportation (NMDOT) District One in conjunction with La Calerita Construction, LLC. (Contractor) will begin a bridge rehabilitation project on I-10 over the University Ave Interchange, milepost 141. This project was awarded in the amount of $8.4 million and is expected to take 200 working days to complete, weather pending. This project includes bridge rehabilitation, roadway reconstruction and lighting. Crews will be working on the installation of detour crossovers on I-10, and installation of concrete barrier wall for the safety of the traveling public. A lane closure is expected for the next two weeks with all traffic shifted to the outside driving lanes in both eastbound and westbound lanes. The contractor’s working hours are Monday through Friday from 7 a.m. to 5 p.m. The New Mexico Department of Transportation is committed to the safety of the traveling public and appreciates your cooperation during this work. For updated information go to: New Mexico Department of Transportation at www.nmroads.com or call 511. _______________ Project Type : Bridge - Replace (11) County : Dona Ana Federal : 2026, 2027 Region : MVM As of September 23 , 2025, the project is in Conceptual status. Anticipated letting date is 9/18/2026 NMDOT - Bridge Replacement *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Bridges / Tunnels

$26,260,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
15
Bidding Soon
327
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2027

Project location map

To Be Determined, Las Cruces, NM

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.