BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of a water / sewer project in Valley City, Ohio. Working plans call for the renovation of a water / sewer project.

As of 5/17/2024 Owner did not have any submissions and will be re-advertising. Request for Statement of Qualifications Liverpool Wastewater Treatment Plant Cambi System Building Enclosure The Medina County Sanitary Engineers (MCSE) are seeking qualified design- build teams to submit a Request for Qualifications (RFQ) to construct a building enclosure over the existing Cambi System at the Liverpool Wastewater Treatment Plant located at 89 Columbia Road, Valley City, OH 44280. The project is anticipated to start July 1, 2024, with a proposed completion by December 31, 2024. MCSE will utilize a progressive design-build (design-build) approach for the procurement and delivery of the project. This approach eliminates the requirements for design and fixed pricing during the process to select the Design-Builder. Question Deadline 05/01/2024 at 4:30 PM ET Project Description The Liverpool Wastewater Treatment facility features the latest thermal hydrolysis process (THP) technology produced by Cambi. THP is a pretreatment process prior to anaerobic digestion of sludge and bio-waste. The unit capacity of the Cambi system installed is 25 dry tons per day, or a population equivalent of approximately 250,000 people. The unit was delivered to the project site fully assembled. It includes a pulper, multiple reactors and a flash tank, plus piping, valves, insulation, cladding, electrical, and instrumentation and controls. This installation represents only the second-ever Cambi installation in the United States. Due to the effects of cold temperatures on the performance of the Cambi system and the lost production and time that the MCSE incurs when temperatures drop below 20 degrees Fahrenheit, the MCSE desires to construct an approximately 8,000 SF building enclosure over the Cambi system. The purpose of the building enclosure will be to maintain a consistent minimum temperature of 55-degrees Fahrenheit during the winter months. Proposed Scope of Services The design-build team shall include at a minimum the following scope of services for the project. 1. Survey 2. Geotechnical 3. Architectural 4. Structural 5. Mechanical 6. Plumbing 7. Electrical 8. Fire Protection

Final Planning

Water / Sewer

$1,750,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
88
Bidding Soon
979
All Active Projects
377
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2024

August 1, 2024

img_map_placeholder

89 Columbia Rd, Valley City, OH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.