BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Morristown, New Jersey. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Reference Number 0000350048 Milling & Resurfacing, Troy Hills Rd/S Beverwyck Rd (C.R. 637) in the Township of Hanover & Parsippany-Troy Hills for the Morris County Department of Public Works, Division of Engineering & Transportation consisting of, but not limited to, 60,414 S.Y. - HMA Milling, 3" or Less, 7,328 Tons - Hot Mix Asphalt 9.5M64 Surface Course, 42 C.Y. - I-9 Soil Aggregate, 454 S.Y. - Concrete Sidewalk, 4" Thick, 91 S.Y. - Concrete Slope Gutter, 6" thick, 438 S.Y. - Stone or Gravel Driveway, 6" Thick, 45 S.Y. - Detectable Warning Surface, 816 L.F. - 9"x20" Concrete Vertical Curb, 1,501 L.F. - Beam Guide Rail, 18 Unit - Tangent Beam Guide Rail Terminal, Railroad Flaggers, Reconstructed & Reset Inlets, Warning & Regulatory Signs, 17 Unit - Tree Removal (various sizes up to 24" diameter) in addition to other miscellaneous items. Question Deadline 04/27/2024 at 12:00 AM ET Questions are submitted online No. Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Maintenance Bond 10 % - Labor and Materials Bond 100 %. Each bid must be accompanied by a certified check, cashier's check or bid bond in the amount of ten percent (10%) (not to exceed $20,000.00) of the total bid, payable to the County of Morris, as a guarantee that if the contract is awarded to the Bidder, will enter into a contract and provide the necessary bonds and insurance as required by the County and the Division of Risk Management. The Successful Bidder Will Be Required to Furnish a Performance Bond, Payment Bond and Maintenance Bond as Specified in the Contract Documents. Each Bid Must Be Accompanied With a Consent of Surety Which States That the Surety Company Will Provide the Bidder With the Performance Bond Specified in the Contract Documents in the Event the Bidder is Awarded the Contract. General Requirements - Bid Deposit Required - Certified Payroll - Insurance Required - Prevailing Wage Required Bidders are required to comply with the requirements of N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27. Document notes: with Bid Number and Name in memo section of check. The County of Morris shall not be responsible for full or partial sets of Contract Documents, including addenda, obtained from any other source. Clearing site shall also include culvert pipe, headwalls, signs, inlets, trees, grubbing of tree stumps and backfilling holes resulting from tree removal. Any trees in conflict with construction shall be removed only when approved by the Engineer. Clearing Site shall also include the removal and resetting of any mailboxes, fences, curbing, utility service of other item which conflicts with construction whether or not it has been designated to be removed or reset in the plans. The Contractor is encouraged to walk the site to make his/her own determination of the items, which conflict with construction, which must be removed and/or reset. No additional payment will be given for items removed or reset by the Contractor during the course of construction, which have not been identified in the plans. Clearing site also includes meeting FRA 213, 213.37, AASHTO, and MUTCD line of sight requirements at road crossings and obstructions of signage. Trees and brush should be cleared within the railroad right of way to a point 250' in each direction from any railroad crossing.

Bid Results

Roads / Highways

$1,467,772.00

Public - County

Paving, Site Work

21

5

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
504
Active Projects
299
Bidding Soon
4,514
All Active Projects
2,052
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2024

June 6, 2024

img_map_placeholder

Multiple Locations, Morristown, NJ


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.