BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Honolulu, Hawaii. Completed plans call for the renovation of a municipal facility.

The work to be done under this project includes furnishing of all labor, material, and equipment necessary to replace the existing Chiller, Cooling Tower, one condenser water pump and two chilled water pumps, and variable frequency drive (VFD) serving AHU-2 with a new (VFD) at Pier 2, Honolulu Harbor, Oahu. Bidders are advised to examine the existing conditions at the project site to familiarize themselves with the nature and extent of work involved. Appointments may be made with the State Harbors Division Maintenance Engineer for clarification of the work involved and the character and quality of materials specified. All Request for Information (RFI) questions and Substitution Requests shall be submitted in HIePRO no later than May 6, 2024, 2:00 p.m., HST Cooling Tower and AC Repairs at Pier 2 Terminal, Honolulu Harbor, Oahu, Hawaii. The scope of work consists of replacing the existing cooling tower, chiller and associated pumps, as well as the variable frequency drive (VFD) for air handling unit-2 (AHU-2) at the Pier 2 Passenger Cruise Terminal, Honolulu Harbor, Oahu, Hawaii. Major items of work include demolition and removal of existing chiller, cooling tower, and AHU-2 VFD; installation of new chiller, cooling tower and associated pumps, as well as AHU-2 VFD; construction of new support frame for new cooling tower with spring isolators; refurbish existing concrete mounts; mechanical and electrical work; and related appurtenances. For additional information, contact Branden Sumida, Project Manager, by phone at (808) 587-1873, or by email at branden.sumida@hawaii.gov. The estimated cost of construction is between $800,000 and $1,400,000. The State reserves the right to reject any or all proposals and to waive any defects in said proposals in the best interest of the public. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Municipal

$1,075,887.00

Public - State/Provincial

Renovation

20

7

4

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
24
Bidding Soon
272
All Active Projects
105
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 17, 2024

July 22, 2024

May 18, 2025

img_map_placeholder

521 Ala Moana Blvd, Honolulu, HI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.