Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 28, 2024 at 8:00 PM
Updated October 1, 2024
Site work for a water / sewer project in Glenville, West Virginia. Working plans call for site work for a water / sewer project.
As of May 28, 2024, no bids received. No definite date for the rebid. Wastewater Treatment Plant (WWTP) UV Unit Replacement. Question Deadline 05/17/2024 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions will be provided at the pre-bid conference, Questions received less than seven days prior to the date for opening of Bids may not be answered. Glenville Utility Board Reserves the Right to Reject Any and R All Bids. Bidders Must Comply With the President's Executive Order Nos. 11246 and 11375, Which Prohibit Discrimination in Employment Regarding Race, Creed, Color, Sex, or National Origin. Bidders Must Comply With Title Vi of the Civil Rights Act of 1964, the Anti-kickback Act, Section 3 Segregated Facilities, Section 109 and the Contract Work Hours Standard Act. Bids Shall Be Accompanied by a Certified Check or Bid Bond Payable to the Glenville Utility Board in an Amount Not Less Than Five Percent (5%) of the Base Bid. Bids Received After the Scheduled Closing Time for the Reception of Bids Will Be Returned Unopened to the Bidders Neither Owner Nor Engineer Will Be Responsible for Full or Partial Sets of Bidding Documents, Including Addenda, if Any, Obtained From Sources Other Than the Issuing Office. Information for Bidders and Form of Proposal Will Be Furnished Upon Request. A Bidder May Not Withdraw His Bid for a Period of Sixty (60) Days After the Date Set for the Opening of Bids. Construction Time Limit for the Contract is Ninety (90) Consecutive Calendar Days to Substantial Completion for Base Bid Work. The Work to Be Bid Upon is Generally Described as Follows: Replacement of Existing Ultraviolet (Uv) System With the System Purchased by the Gub. Uv System Work Includes the Removal of Existing Uv System, Temporary Pumping Around the Uv Channel, Peracetic Acid (Paa) Disinfection, Reshaping the Concrete Channel to Conform to the New Uv Channel Requirements Corresponding to Electrical Work to the New Uv System. Federal Law Prohibits Discrimination on the Ground of Race, Color, National Origin, Religion, Age, Handicap and Sex in This Project. Minority Firms Are Particularly Encouraged to Participate.
Final Planning
Water / Sewer
$824,615.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 24, 2024
December 24, 2024
To Be Determined, Glenville, WV
Related To This Project
Glenville, WV
--
Glenville, WV
Bid Date: Jun 21 2024
Glenville, WV
Bid Date: Jul 09 2024
Glenville, WV
Bid Date: Sep 10 2024
Glenville, WV
Bid Date: Oct 04 2024
Glenville, WV
Bid Date: Feb 06 2025
Glenville, WV
Bid Date: May 01 2024
Glenville, WV
Bid Date: May 07 2024
Glenville, WV
Bid Date: Dec 19 2023
Glenville, WV
Bid Date: Oct 11 2023
Glenville, WV
Bid Date: Apr 08 2025
Glenville, WV
Bid Date: Mar 31 2023
Glenville, WV
Bid Date: Feb 23 2023
Glenville, WV
Bid Date: Jan 20 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.