BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Goodlettsvlle, Tennessee. Working plans call for site work for a water / sewer project.

The Project consists of the following major elements: sewer force main point repairs, complete STEP system abandonments and installations, replacement of existing STEP systems pumps and appurtenances as required, service line connections, valve removal and installation, exploratory investigation, surface restoration, and ancillary work for a complete project as shown or specified in the Contract Documents. SPECIAL NOTICE TO DISADVANTAGED BUSINESS ENTERPRISES (DBE) FIRMS All qualified Disadvantaged Business Enterprises (DBE) firms desiring to bid as a General Contractor, sub-contractor, professional service provider, supplier, or equipment vendor are encouraged to contact the Governors Office of Diversity Business Therefore, certain restrictions and other federal requirements attach to this opportunity. All bidders must be licensed General Contractors as required by the Contractors Licensing Act of 1994 of the General Assembly of the State of Tennessee and qualified for the type of construction being bid upon Completion- 550 consecutive calendar days. Question Deadline 05/03/2024 Every request for such interpretation should be in writing addressed to Dudney Fox, P.E.(dudney@foxpe.com); FOXPE LLC, at 2711 Berrywood Dr, Nashville, Tennessee 37204, and to be given consideration must be received at least five days prior to the date fixed for the opening of Bids SCOPE A. The work described in these Contract Documents consists of furnishing, delivering, and installing all materials, equipment, and products for the construction of the I&I Reduction / Sewer Rehabilitation, such that the furnished product is fully functional and operational as intended in the Contract Drawings and Specifications. B. Furnish all materials, power, equipment, tools, labor, transportation, and other items necessary or convenient to the Contractor for the installation of the equipment, materials, and products specified or described in these Contract Documents and for the completion of all work to be performed by the Contractor as specified herein. C. The work includes, but is not limited to, the following major work elements: Sewer force main point repairs, complete STEP system removals and installations, replacement of existing STEP systems pumps and appurtenances, service line connections, valve removal and installation, exploratory investigation, surface restoration, and ancillary work as necessary for a complete project as shown on the Drawings and Specifications. TIME FOR COMPLETION AND LIQUIDATED DAMAGES Bidder must agree to commence work on or before a date to be specified in a written Notice to Proceed of the Owner and to fully complete the Project within 550 consecutive calendar days thereafter. Bidder must agree also to pay as liquidated damages the sum of $600 for each consecutive calendar day in default as hereinafter provided in the General Conditions and Supplemental General Conditions.

Final Planning

Water / Sewer

$3,000,000.00

Public - City

Site Work

12

14

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
25
Bidding Soon
721
All Active Projects
310
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2024

July 22, 2024

img_map_placeholder

Multiple Locations, Goodlettsvlle, TN

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.