BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 2, 2024 at 8:00 PM

Updated May 7, 2024

Site work for an educational facility in Crane, Oregon. Completed plans call for site work for a educational facility.

Installation includes installing turn key new working linear pivot precision irrigation system hooked to current Harney 1J irrigation and domestic water system to effectively irrigate plot of land and crops in front of Crane Dormitory. Precision irrigation system should have latest technology to ensure student learning for the future in college and career opportunities. Labor cost, machinery usage, travel cost backflow valve inspection and all other fees to be included. Work will commence within ten (10) calendar days of the notice to proceed.

Post-Bid

Educational

$150,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
0
Bidding Soon
17
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2024

June 5, 2024

Project location map

43277 Crane-Venator Rd, Crane, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.