BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 3, 2024 at 8:00 PM

Updated July 5, 2024

Demolition, site work and renovation of a medical facility in San Francisco, California. Completed plans call for the demolition of a 73,339-square-foot medical facility; for the renovation of a medical facility; and for site work for a medical facility.

This project is located at the Zuckerberg San Francisco General Hospital & Trauma Center (ZSFG), Building 5, at 1001 Potrero Avenue, San Francisco, California. This project is permitted under HCAI (Department of Health Care Access and Information), formerly known as OSHPD (Office of Statewide Health Planning and Development). The Work consists of a portion of the ZSFG Building 5 Family Health Center Relocation project, primarily consisting of the Ward C and Ward E interior demolition and corridor renovation located on the 5th floor of Building 5. The Work includes a phased demolition sequence to demolish the interior wards, set up construction barriers and complete the new central corridor construction. ESTIMATE: Approximately $5,900,000 LBE Subcontracting Participation Requirement is 20% LBE For technical questions on the Bid Documents, scheduling of special field visits, and submittal of Request for Product Substitutions, contact the following Project Architect/Engineer: Gabriel Lim San Francisco Public Works 49 South Van Ness Ave, Suite 1100 San Francisco, CA 94103 Email: Gabriel.Lim@sfdpw.org For questions on C MD bid documents and submittal of required C MD Forms, contact the following Contract Compliance Officer: Ivan Oldenkamp Contract Monitoring Division (C MD) General Services Agency City and County of San Francisco 1455 Market Street, Suite 16A San Francisco, CA 94103 Telephone: (415) 581-2310 Email: Ivan.Oldenkamp@sfgov.org Right reserved to reject any or all bids and waive any minor irregularities. CONTRACT DURATION: 540 consecutive calendar days from NTP to Substantial Completion.

Bid Results

Medical

$5,699,150.00

Public - County

Demolition, Renovation, Site Work

769

39

103

5

Subscribe For Documents

50 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
8
Bidding Soon
1,506
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2024

August 26, 2024

Project location map

1001 Potrero Ave, San Francisco, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.