BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 21, 2024 at 8:00 PM

Updated October 22, 2024

Site work for a civil project in San Francisco, California. Working plans call for site work for a bridge / tunnel; and water / sewer project.

The SFPUC has also issued a companion RFQ seeking qualified Tunnel Contractors for Contract No. WW-756 Lower Alemany Area Stormwater Improvements. Candidates can submit for either or both RFQs. To submit a bid for the Request for Bids (RFB) for Contract No. WW-756 Lower Alemany Area Stormwater Improvements, Bidder must be a: (1) Qualified General Contractor and a Qualified Tunnel Contractor as a single entity; or (2) Qualified General Contractor and Qualified Tunnel Contractor must form a Joint-Venture or (3) Qualified General Contractor must form prime-subcontractor relationship with Qualified Tunnel Contractor. The Lower Alemany Area Stormwater Improvements project involves constructing an approximately 1.4-mile-long Alemany Auxiliary Sewer to improve collection system capacity to manage stormwater for the Level of Service (LOS) storm, a statistically derived storm lasting three hours, with a total of 1.3 inches of rainfall and defined peak rainfall intensity. The Alemany Auxiliary Sewer alignment primarily occurs along Alemany Boulevard, Gaven Street (south of I-280) and Boutwell Street east of the I-280/Highway 101 interchange. The Alemany Auxiliary Sewer would connect upstream to the existing Alemany Sewer and downstream to the existing Industrial Sewer and Islais Creek Transport/Storage. The Project includes construction of the following components Alemany Auxiliary Sewer - Tunnel and Shafts: Approximately 6,320 linear feet of 10-foot inside-diameter (ID) tunnel for the Alemany Auxiliary Sewer and three associated construction shafts. Alemany Auxiliary Sewer - Box Sewer: Approximately 1,000 linear feet of a single 7-foot high by 13-foot wide box sewer via cut-and-cover construction methods. Vent Shafts - Approximately three shafts drilled from the surface to the tunnel elevation with associated ducting and vent pipes to allow the new tunnel to pull in and exhale air during filling. The three shafts built for construction will also be converted to vent shafts. Upstream and downstream sewer connections to the existing active sewer system.

Final Planning

Water / Sewer

$300,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
441
Active Projects
218
Bidding Soon
3,149
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 11, 2024

January 10, 2025

Project location map

Alemany Blvd, San Francisco, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.