Published January 14, 2026 at 7:00 PM

Updated January 15, 2026

Site work for a civil project in San Francisco, California. Completed plans call for site work for a bridge / tunnel; and water / sewer project.

The San Francisco Public Utilities Commission authorized the Water System Improvement Program Project Labor Agreement to be extended to the Sewer System Improvement Program and the Auxiliary Water Supply System Pumping Station 2 project. The agreement to extend the WSIP PLA to all SSIP projects and the AWSS project is known as the Extension Agreement. This Project is covered by the WSIP PLA and Extension Agreement (collectively referred to as PLA). A copy of the PLA documents are included as Section 00 73 18.10 in the contract documents. Bidders are advised that the PLA is incorporated into and made a part of any contract awarded for this Project, subject to exceptions in the Extension Agreement. Subcontracting opportunities may include, but not limited, to the following major types of work: tunnel and shaft construction,ventilation shaft, varies utility relocation, trench support of excavation, dewatering and large concrete box sewer related construction. The objective of the project is to construct an auxiliary wet weather combined sewer to mitigate flooding at the lower Alemany area during a LOS storm. The work is to be performed in San Francisco, California. The Engineers Estimate is $277,100,000. There will be no LBE bid discounts for this contract. The Local Business Enterprise (LBE) subcontracting requirement is 3.00%. The LBE subcontracting requirement can only be met with CMDcertified San Francisco Micro and Small-LBEs. The majority of the contract scope is primarily large tunneling work. The tunneling work is a very specialized construction that includes large shafts and trenchless technology. As such, very limited contractors can perform this work nationwide. PUC-LBEs cannot be counted towards meeting the LBE subcontracting requirement(s). All Bidders shall submit documented Good Faith efforts with their Bids as directed on CMDForm 2B, except those who exceed the above-stated subcontracting requirement(s) by at least 35%. Refer to CMDAttachment 1. Failure to comply with Chapter 14B requirements may result in a Bid being deemed non-responsive and ineligible for Contract award. Please contact Jason Chow at 415- 554-0631 or Jason.Chow@sfgov.org for further information about the LBE requirements. Bids, the Bidder shall, no later than the 10th working day prior to the date of Bid opening, provide written notice to the Manager, Contract Administration Bureau, setting forth with specificity the grounds for the objection.

GC Bidding

Water / Sewer

$277,100,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
495
Active Projects
199
Bidding Soon
2,826
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2026

February 8, 2027

Project location map

Alemany Blvd, San Francisco, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.