BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, remodeling and renovation of a playground / park / athletic field in San Francisco, California. Completed plans call for the remodel of a playground / park / athletic field.

The Project is described as: furnishing and installing nursery-related equipment at multiple nursery sites. BID ITEM 1: Furnish and Install Soil Boiler at GGP Nursery | BID ITEM 2: Furnish and Install Soil Boiler at Botanical Garden Nursery TRADES REQUESTED: DEMO | SOIL BOILERS | ELECTRICAL | PLUMBING, MECHANICAL | FENCING This Request for Bid is for furnishing and installing nursery-related equipment at multiple nursery sites. The Request for Bid includes the Scope of Work below and the information included in Attachment 1. PROJECT SCHEDULE: The length of work for this project is 90 calendar days from notice to proceed until substantial completion, with 15 calendar days from substantial completion until final completion. The contractor will be required to meet the listed project schedule. All questions regarding this project are due no later than Tuesday, April 30, 2024 by 5pm. Questions must be emailed to Gabriel.meil@sfgov.org and cc bridget.webster@sfgov.org Questions regarding this project shall be addressed to Gabriel Meil, (415) 254.5217, (Gabriel.meil@sfgov.org).

Bid Results

Playgrounds / Parks / Athletic Fields

$277,000.00

Public - City

Demolition, Remodeling, Renovation, Site Work

7

3

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
50
Bidding Soon
1,753
All Active Projects
741
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2024

June 17, 2024

img_map_placeholder

100 Martin Luther King Jr Dr, San Francisco, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.