Site work for a water / sewer project in Leesburg, Georgia. Completed plans call for site work for a water / sewer project.

The project is the construction of water and sanitary sewer improvements located in Lee County, Georgia for the Lee County Utilities Authority. The project generally consists of furnishing all products and performing all labor necessary to construct approximately 2,438 l.f. of 8" and 10" water main, 4 fire hydrants, water valves, 2,330 l.f. of 10" sanitary sewer main, 6 sanitary sewer manholes and all appurtenances A bid bond shall be required in the amount of 5% of the total bid amount. A Contract Performance Bond and a Materials and Payment Bond will be required of the successful bidder. All work on the project must be completed within 180 consecutive calendar days of the commencement of the Contract Time as defined in the General Conditions of the Contract. Question Deadline 05/29/2024 at 12:00 PM ET The final day any questions will be accepted. All anticipated rights-of-way and easements will be obtained by the Owner for construction associated with this project. No submitted proposal may be withdrawn for a period of sixty (60) days after the closing time scheduled for the receipt of bids. The LEE COUNTY UTILITIES AUTHORITY, hereinafter called the Owner, reserves the right to reject any or all Proposals and to waive any formality or technicality and to award the Proposal as may be in the best interest of the Owner, or readvertise for bids. The Owner may issue change orders altering the original scope of work to address changes or unforeseen conditions necessary for the project completion. Work included: 1. Wherever possible throughout the Contract Documents, the minimum acceptable quality of workmanship and materials has been defined either by manufacturer's name and catalog number or by reference to recognized industry standards. 2. To ensure that the specified products are furnished and installed in accordance with design intent, procedures have been established for advance submittal of design data and for its review and approval or rejection by the Engineer. 3. A sample submittal form is included at the end of this section for the Contractors use.

Post-Bid

Water / Sewer

$600,000.00

Public - County

Site Work

13

9

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
52
Bidding Soon
577
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2024

July 4, 2024

Project location map

Multiple Locations, Leesburg, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.