Site work for a water / sewer project in Palm Coast, Florida. Completed plans call for site work for a water / sewer project.

This Invitation to Bid is issued for the purpose of securing qualified contractors to install a new Aeration system to two of the City of Palm Coast's MGT main feed lines. Question Deadline 05/23/2024 at 2:00 PM ET . GENERAL: This work will include the following: o Unloading the equipment from the trucks and set in place. o The cost of crane must to be included. o Equipment will require mounting to the pad and hurricane strapping to the pad using S.S. hardware. o All piping from existing 12" feed line to be piped into new equipment as per the drawing provided below using all 316 Stainless steel pipes. o All piping is above ground and will require S.S. screw type pipe jack stands. o All pipes must be disinfected before installed. o All hardware will be of 316 S.S. o Butterfly valves, valves, and gasket material must be NSF approved. o Project will include room for any onsite modification that may need to be made. o Project will include any and all electrical installed from Plant MCC to new equipment following equipment Specs and NEC codes. o Grounding system must be installed as per NEC codes and a grounding test must be performed with proof of passing test. o All permits and inspections for the project are to be included. o All water quality sampling will be included in the cost of the project. o All samples must pass before entering the current water system. o On site visit is required before submitting bid. Question Deadline: May 23rd at 2PM Additional Scope: 1.) Electrical wiring will need to include aluminum piping any strapping and wires from the control boxes up to the j-boxes on top of the unit for each pump. Unistrut mounted for pipe straps will need to be glued to tank, (DO NOT DRILL INTO TANK). 2.) Any equipment supplied by others that is not part of the fiberglass tank will need to be installed by the contractor. (Valves, check valves, ball valves, reducers, control cabinets, piping) 3.) Unit blower will need to have ducting installed from blower motor unit to top of tank. Piping should be as per drawings provided using PVC pipe and include all strapping. 4.) Overflow port on back of tank will need PVC pipe installed downwards with 316 S.S. screen installed on end to keep out foreign material. 5.) NOTE: new drawing shows electrical equipment mounted on stand-alone rack, we will be mounting equipment on 1-5/8" X 1- 5/8" S.S. Unistrut across the front of tank, bolted to taps provided. 6.) Tank and all equipment will need to bolted down to concrete and concrete pads installed for pipe supports.

Award

Water / Sewer

$225,000.00

Public - City

Site Work

1

3

31

6

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
233
Active Projects
122
Bidding Soon
2,050
All Active Projects
819
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 30, 2024

July 1, 2024

img_map_placeholder

To Be Determined, Palm Coast, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.