BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 3, 2024 at 8:00 PM

Updated July 5, 2024

Demolition and site work for a bridge / tunnel in Greenville, South Carolina. Completed plans call for the demolition of a bridge / tunnel; and for site work for a bridge / tunnel.

The City of Greenville is requesting bids from qualified contractors for the demolition of an existing pedestrian bridge at the TD Convention Center, located in Greenville, SC and owned by the City of Greenville. The proposed scope of work includes the removal of the concrete deck surface (including concrete deck and steel deck), masonry work and sandblasting. Revised Question/Clarification Deadline: May 29, 2024, NO LATER THAN 2:00 p.m. EST Inquiries can be sent to: jmonroe@greenvillesc.gov. THE CITY OF GREENVILLE, SC IS AN EQUAL OPPORTUNITY EMPLOYER

Award

Bridges / Tunnels

$136,500.00

Public - City

Demolition, Site Work

4

6

6

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
1
Bidding Soon
686
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2024

July 12, 2024

Project location map

1 Exposition Dr, Greenville, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.