Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 5, 2024 at 8:00 PM
Updated June 8, 2024
Site work for a water / sewer project in Coupeville, Washington. Completed plans call for site work for a water / sewer project.
Project Summary Repair the existing rock bulkhead and piling repair on the Port of Coupeville Shoreline. The District reserves the right to waive any informality in a submitted proposal. Any questions related to the RFP should be addressed to the Executive Director, Chris Michalopoulos at executivedirector@portofcoupeville.org 360 222 3558 or to the Project Manager, Mary Hogan at projectmanager@portofcoupeville.org 360 222 3051 Scope of Services o Rock bulkhead repair and piling foot repair. o Permit prep and engineering. o Permit submittals. We are requesting proposals for repair to +/- of the existing rock bulkhead and piling repair to the Port of Coupeville shoreline located at 26 Front St NW, Coupeville, WA. The bulkhead needs to be reconstructed +/- 1' landward, with the base rocks placed +/- 3' below beach grade and built to match existing height. New rock will be needed as well. Quarry spalls are to be placed behind the armor rock and filter fabric placed between spalls and the band. The Port will get written authorization from the neighboring owners of the Museum property required to complete the tie in with the rock bulkhead. The piling to the walkway will be secured by cutting 3-4" of the concrete foundation and placing flat sheet piling driving in the same footprint down +/-3' with concrete poured within the gap between the sheet piling and concrete foundation. The bottom concrete step will be removed from the existing staircase, flat steel sheet piling will be driven into to the beach +/-3' down. The second step will be formed, and new concrete poured to recreate the bottom step. Project is expected to be approved as an emergency permit from Island County, WDFW, and ACOE. An expedited HPA is to be acquired to authorize work and all permits from the County and ACOE will be acquired after the fact.
Award
Water / Sewer
$126,769.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
