BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Coupeville, Washington. Completed plans call for site work for a water / sewer project.

Project Summary Repair the existing rock bulkhead and piling repair on the Port of Coupeville Shoreline. The District reserves the right to waive any informality in a submitted proposal. Any questions related to the RFP should be addressed to the Executive Director, Chris Michalopoulos at executivedirector@portofcoupeville.org 360 222 3558 or to the Project Manager, Mary Hogan at projectmanager@portofcoupeville.org 360 222 3051 Scope of Services o Rock bulkhead repair and piling foot repair. o Permit prep and engineering. o Permit submittals. We are requesting proposals for repair to +/- of the existing rock bulkhead and piling repair to the Port of Coupeville shoreline located at 26 Front St NW, Coupeville, WA. The bulkhead needs to be reconstructed +/- 1' landward, with the base rocks placed +/- 3' below beach grade and built to match existing height. New rock will be needed as well. Quarry spalls are to be placed behind the armor rock and filter fabric placed between spalls and the band. The Port will get written authorization from the neighboring owners of the Museum property required to complete the tie in with the rock bulkhead. The piling to the walkway will be secured by cutting 3-4" of the concrete foundation and placing flat sheet piling driving in the same footprint down +/-3' with concrete poured within the gap between the sheet piling and concrete foundation. The bottom concrete step will be removed from the existing staircase, flat steel sheet piling will be driven into to the beach +/-3' down. The second step will be formed, and new concrete poured to recreate the bottom step. Project is expected to be approved as an emergency permit from Island County, WDFW, and ACOE. An expedited HPA is to be acquired to authorize work and all permits from the County and ACOE will be acquired after the fact.

Award

Water / Sewer

$126,769.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
42
Bidding Soon
1,839
All Active Projects
749
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 16, 2024

June 17, 2024

img_map_placeholder

24 Front St NW, Coupeville, WA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.