BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Kalama, Washington. Completed plans call for the construction of a 42,300-square-foot industrial development; for site work for a industrial development; and water / sewer project.

The Work includes: All labor, materials, tools, equipment, permits, testing, training, and supervision for the installation of all components of the Spencer Creek Building 7802 project as shown in the plans and specifications, generally including: 1. Construct new shell building of approximately 42,300 gross square feet. 2. Perform ground improvement work consisting of concrete foundation to be placed under the building footprint. 3. Prepare required submittals and attend required meetings with the Owner and regulatory agencies as required by permits for the project. 4. Mobilize to the site. 5. Implement temporary site controls including traffic controls, and temporary erosion and sediment controls (TESC). 6. Demolish, clear and grub site, and perform site grading as required for new site civil, landscaping and utilities work. 7. Furnish and install new concrete and asphalt pavement surfaces. 8. Furnish and install new potable watermain, appurtenances, buried utilities, fire hydrant, valves, meters, etc. 9. Furnish and install new sanitary gravity main, laterals, appurtenances, manholes, cleanouts, etc. 10. Furnish and install new sanitary pump station and sanitary forced main, appurtenances, valves, etc. 11. Furnish and install new stormwater system with bioretention facilities, infiltration facilities, mechanical treatment, etc. 12. Furnish and install new potable water and fire standpipe system. 13. Demobilize equipment, labor, temporary facilities and unused materials from the site. 14. Other work required to complete the primary tasks identified above and described in the Contract Documents. For further information contact Darin Sampson, Project Manager, Port of Kalama, at (360) 673-2325 or dsampson@portofkalama.com. Project no. 5363-04 / 021125

Bid Results

Industrial

$15,873,091.00

Public - Federal

New Construction, Site Work

137

33

151

4

Subscribe For Documents

59 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
34
Bidding Soon
516
All Active Projects
222
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.