Site work for a power facility in Milwaukee, Wisconsin. Completed plans call for site work for a power facility.
Bidder participation is urged to become familiar with all aspects of the project and bidding requirements. All questions should be submitted in writing prior to 12:00 PM on Wednesday, May 1, 2024 to dpitts@milwaukee.gov. No questions may be answered after that date and time. No questions shall be answered verbally. No verbal information from any source is to be relied upon by any respondent in the development of their Bid. Written questions and responses will be documented by way of addenda, which will be forwarded to all bidders. The project generally consists of providing the replacement of seven (7) Automatic Transfer Switches (ATS) with PLC controllers and Master Generator Synchronous Controller. The intent is to replace the rollout switch assembly and controller, keeping the cabinet and manual bypass intact. Building shall remain operational throughout project. The prime contractor shall be credited for the entire expenditure to SBE firms only if all of the identified scope of work is performed directly by the certified SBE firm. The prime contractor shall be credited for the entire expenditure to SBE manufacturer only if the manufacturer produces goods from raw materials or substantially alters them for resale. Only 20% of the SBE goals may be expended for SBE suppliers that do not manufacture products they supply. A description of the scope of work to be performed by the SBE on this project; and In accordance with Chapter 370 of the Milwaukee Code of Ordinances, Small Business Enterprise (SBE) participation is required in all contracting activities of the Department of Public Works. The ordinance requires that certified SBEs be utilized for 25% of the total dollars annually expended through prime contracts or subcontracts for Construction and the purchase of Goods and Services. For the purchase of Professional Services the requirement is 18%. To that end, the Commissioner of Public Works, as a contracting officer for the City, requires all bidders to utilize SBEs as subcontractors and material suppliers on all contracts. For this contract, bidders are required to achieve the minimum percent of SBE participation listed in the Acknowledgements page/section and/or the Official Notice document. If you have any questions call (608) 266-6861 ERD-7777-E (R. 01/2011) Located at: 2333 North 49th Street Milwaukee, Wisconsin 53210 Time for Completion: 90 Working Days. End Date 09/08/2024 Liquidated Damages, per diem: $475.00 In submitting this bid, the bidder understands that the Commissioner of Public Works reserves the right to reject any and all bids. If written notice of the acceptance of the bid is mailed, telegraphed, or delivered to the undersigned within forty-five (45) days after the opening thereof, the undersigned agrees to execute and deliver the contract in the prescribed form (contract form on file in the office of the Commissioner of Public Works) and furnish the required performance and payment bonds, and to meet such insurance requirements as may be required, within ten days after the receipt of the official notice of award.
Award
Power Plant
$959,556.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 8, 2024
June 10, 2024
2333 N 49th St, Milwaukee, WI
Related To This Project
Milwaukee, WI
Bid Date: May 16 2024
Milwaukee, WI
--
Milwaukee, WI
Bid Date: Jun 20 2024
Milwaukee, WI
--
Milwaukee, WI
--
Milwaukee, WI
--
Milwaukee, WI
Bid Date: Jun 04 2024
Milwaukee, WI
--
Milwaukee, WI
Bid Date: Jun 24 2024
Jones Island & South Shore Water Reclamation Facility Semi-continuous Vibration Monitoring - 5402312
Milwaukee, WI
Bid Date: May 27 2024
Milwaukee, WI
Bid Date: May 22 2024
Milwaukee, WI
Bid Date: May 03 2024
Milwaukee, WI
Bid Date: May 03 2024
Milwaukee, WI
Bid Date: May 03 2024
Milwaukee, WI
Bid Date: May 03 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.