BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 11, 2024 at 8:00 PM

Updated June 12, 2024

Site work and paving for a road / highway in Mabton, Washington. Completed plans call for site work for a road / highway; and for paving for a road / highway.

City-wide pavement preservation including, but not limited to, surface preparation, application of emulsified asphalt and aggregate for Otta seal, and all other appurtenances required to complete the work. Gravel street conversion including, but not limited to, surface preparation, preleveling, compaction, application of emulsified asphalt and aggregate for Otta Seal, and all other appurtenance required to complete the work. The basis of award shall be the lowest, responsive, responsible bidder for Schedule A or Schedule A and Additive Item 1 as available funding allows and as it best serves the interests of the Contracting Agency. The Work shall be Physically complete within 45 working days after the commencement date stated in the Notice to Proceed. All bidding and construction is to be performed in compliance with the Contract Provisions and Contract Plans for this project and any addenda issued thereto that are on file at the office of the City Clerk, Mabton, Washington. All Proposals must be accompanied by a certified check, postal money order, cashiers check, or Proposal bond payable to the "City of Mabton" and in an amount of not less than five percent (5%) of the total Proposal amount. All Proposals must be accompanied by a certified check, postal money order, cashiers check, or Proposal bond payable to the "City of Mabton" and in an amount of not less than five percent (5%) of the total Proposal amount. The undersigned has reviewed and fully understands the provisions in the Contract regarding liquidated damages and agrees that liquidated damages shall be $1,000 per day for each and every working day beyond the Contract Time allowed for substantial completion until the Substantial Completion Date is achieved and $1,500 for each and every working day required beyond the Contract Time for physical completion until the Physical Completion Date is achieved. The City of Mabton expressly reserves the right to reject any or all Proposals and to waive minor irregularities or informalities in any Proposal.

Post-Bid

Roads / Highways

$200,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
27
Bidding Soon
293
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2024

June 14, 2024

Project location map

Multiple Locations, Mabton, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.