Renovation of a military facility in Richmond, Virginia. Completed plans call for the renovation of a military facility.

Defense Supply Center Richmond (DSCR) Building 59 Exterior Repaint This is a solicitation for construction prepared in accordance with the format in FAR Part 36, as supplemented with additional information included in this notice. The solicitation number SP4703-24-R-0017 is issued as a request for proposal (RFP). The resulting contract will be a firm-fixed price award with an expected Period of Performance of 070 days from notice to proceed. This acquisition is set-aside for 100% small businesses. The North American Industry Classification System (NAICS) Code is 238320 (Painting and Wallcovering Contractors). The small business size standard is $19M. Department of Labor Wage Determination based on location of the service provided (Chesterfield County, VA). Partial proposals will not be accepted. **********************************Specific Requirements************************* For an offer to be considered for award, the contractor must be within a commutable driving distance to the DSCR facility. A 120-mile radius from DSCR is considered the commutable radius. The DSCR building 59 exterior wall finish has deteriorated in a variety of areas to the point water is entering the building. The location of building 59 is shown on the map in red at the end of the attached SOW. The objective of this project is to clean, prepare, and paint all the walls and underside of the canopies and install new caulking where current caulking exists. oUsing environmentally friendly chemicals and high-pressure water, pressure wash the entire east and west exterior walls, dock face, personnel doors and frames, roll up door frames, steel angle, underside of all canopies, fire sprinkler piping, piping, conduit, all sides of the one-story offices etc. to remove all growth, loose caulk/mortar/paint etc. After pressure washing is complete an inspection is required to confirm acceptability. Provide two business days' notice for this inspection. oCaulk all expansion joints, windows, vents, doors, appurtenances and area where caulk was removed etc., If any doors, windows etc. don't have caulk add caulk and match the door or window frame color. A known complying product is Sherwin Williams LOXON NS2 Two component non-sag smooth polyurethane sealant (submittal required). oThe contractor shall seal/cover/fill any other holes in the block. Provide a submittal on what will be used to seal/cover/fill. oRemove any loose mortar or concrete from any area. Point up using the same color and type of mortar. Tool all joints as necessary. oPrior to painting a government inspection is required to confirm acceptability. Provide two business days' notice for this inspection. oPaint the exterior walls, all piping, conduit, personnel doors and frames and roll up doorframes, dock faces and the underside of all canopies that are currently painted. Do not paint sprinkler piping. A known complying paint is Sherwin Williams Latitude exterior acrylic flat K60-650 series, the same color as existing. For the painting of metal surfaces a known complying product is Sherwin Williams Pro industrial DTM acrylic semi-gloss B66-1150series. Do not paint fire sprinkler piping. The contractor shall take a paint sample and match each color. Paint all areas with two coats. Once the first coat is completed and dry an inspection is required to confirm acceptability prior to the 2nd coat. Provide two business days' notice for this inspection. oIf any equipment, ladders etc. are used on the roof, the roof shall be protected from damage by adding sufficient protection underneath equipment. The contractor shall provide a plan on how they will protect the new roof. Any damaged to the roof caused by the contractor will be repaired and warrantied by the contractor at no cost to the government. oThe contractor will be allowed to use the nearest fire hydrant for water. The contractor is required to install a backflow preventer that's been calibrated within the last 6 months. Provide documentation prior to use. The contractor shall also submit for a hydrant permit .Contact the PM 2 weeks prior to needing to use the hydrant. oThe contractor shall ensure all roofs, docks, grass etc. are clean from all paint chips, mortar, etc. when pressure washing is completed and prior to painting. oAny items on the docks, grass etc. that are in the way of any work shall be moved and returned by the contractor. oThe contractor shall provide all tools, ladders, lifts etc. so the government can perform inspections. oIf electrical power is available on the outside of the building the contractor may use. Otherwise, the contractor shall provide their own power. No cords can be run through windows, doors etc. oDon't remove any items from the walls, work around them. oPlace "wet paint" signs in numerous areas to alert other personnel. oProvide a portable bathroom with hand washing station. oContractor to take their own measurements. oAll government inspections shall take place on a Tuesday, Wednesday or Thursday regardless of when notification is provided. Award will be made to the lowest priced, technically acceptable (LPTA) offeror that meets the requirements stated in the Statement of Work and the solicitation. Also refer to clauses and provisions includes in this notice. Past performance will be considered a part of Technical Acceptability, and the Contracting Officer will pull contractor data from CPARS and SPRS. The contractor must be registered in the System for Award Management (SAM) prior to award. If not already registered in SAM, go to the SAM website www.sam.gov to register prior to submitting your quote. **********************************Submission Requirements************************* Instructions: Instructions contained herein are to serve as a guide in preparation of offers for this solicitation and are not intended to be all inclusive. These instructions generally describe the type and extent of information that should be provided in the offer and emphasize several areas that are generally considered significant. The offeror is expected to completely examine and analyze all aspects of the technical areas to be addressed and to include information in its offer that will enable the evaluators to determine the offerors' understanding of the requirements. Offers submitted shall be contained in two separate volumes as follows: Volume I - Technical Submission: The Technical Submission should consist of two elements: (1) A description of the vendors' understanding of the work to be performed as described in the Statement of Work. The description should demonstrate an understanding of the requirement and include a plan for satisfying the Government's minimum needs. The description should outline the actual work as specifically as possible. (2) Past Performance: The vendor shall document past performance and experience working with projects similar to the one described in the SOW. Documentation shall include relevant contract numbers, a brief description of the scope and magnitude of the work, information pertaining to when the work was completed, and a customer POC with contact information. Past performance and experience should demonstrate relevancy to the solicited projects, and document customer satisfaction and quality level achieved on prior projects. Total Page Limit for Volume I: Five (5) pages. Volume II - Pricing: By way of a fully executed/signed (including Section B) SF-1442, a firm fixed price quotation shall be provided for this requirement. Additional pricing information may be requested and/or provided separately as necessary. The Contractor is responsible for providing adequate documentation to enable a thorough evaluation of the offer and may choose to supplement the lump sum pricing stipulated on the SF 1442 with a formal quote and/or price breakdown on company letterhead, if desired. *****************************************Evaluation Criteria********************* The offer will be evaluated on the basis of the following criteria: Factor 1 - Technical Acceptability - In evaluation of this factor, offers will be evaluated to ensure: 1. The Vendor possesses an adequate understanding of the work as well as a process for ensuring quality and timeliness. 2. The Government has an acceptable level of confidence that the vendor can adequately perform the work described in the SOW. Based on the Government's evaluation of the respective vendor's technical submission, each vendor shall be assigned an overall Technical Rating in accordance with the definitions below: Technically Acceptable: Offer meets the requirements of the solicitation and based on the offeror's performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror's performance record is unknown. Technically Unacceptable: Offer does not meet the requirements of the solicitation and/or based on the offeror's performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort. Factor 2- Price Proposed price will be evaluated to determine reasonableness and completeness. The total firm-fixed price will be evaluated. *****************************************Special Instructions******************* All inquiries must be submitted no later than COB 06/21/24. Acceptable method of quote or inquiries submission is Email to robert.moragues@dla.mil. A site visit will be held on 06/19/24 @10:00 at Defense Supply Center Richmond(DSCR) Building 59 A Bay. In order to attend, interested parties MUST coordinate with the Project Manager, Mike O'Connor, at least 72 hours prior to the site visit. Access to Defense Supply Center Richmond is dictated by the language at the following location: https://www.dla.mil/Aviation/Installation/Visitors-and-ID-Office/ . A new system was implemented on 3 January 2023 to screen visitors and contractors for installation access at DSCR. The new system is designed to increase efficiencies, enhance the protection of personal information during the vetting process and eliminate the use of hard copy DLA Form 1815s. The new screening system will require visitors and contractors to pre-enroll in DBIDS (Defense Biometric Identification System). To begin the process, visitors and contractors will complete registration through the pre-enrollment website: https://dbids-global-enroll.dmdc.mil. Upon entry of their information, visiting personnel will be provided an electronic form to download, which will have an individualized barcode and alpha numeric code. The codes will be electronically sent to the visiting person's sponsor. Once in receipt of the barcode, the sponsor will email Security and Emergency Services and provide the barcode and sponsorship information. Once the visitor/contractor is vetted and approved for installation access, Security & Emergency Services will notify the sponsor that the visitor/contractor can go to the DSCR Visitor Center to obtain his/her pass. At the Visitor Center, the visitor provides the barcode and code provided earlier in the process and completes the credentialing process. Coordinate site access with Mike O'Connor at 804-573-2988 or Michael.OConnor@dla.mil. Questions are due 06/21/24 end of day. Submit questions via email to Robert.Moragues@dla.mil. Quotes are due 07/08/24, end of day. Submit quotes via email to Robert.Moragues@dla.mil. The points of contact (POC) for this requirement are Contract Specialist Robert Moragues (robert.moragues@dla.mil) and Contracting Officer Brandon Jump(brandon.jump@dla.mil). Reference Attachment 1 - Statement of Work (SOW) for additional work scope and details. Disclosure of Magnitude: The estimated dollar value for this requirement is between $500,000.00 and $750,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Military

$750,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
30
Bidding Soon
777
All Active Projects
327
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2024

September 6, 2024

img_map_placeholder

6090 Strathmore Rd, Richmond, VA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.