Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a detention facility in Laconia, New Hampshire. Completed plans call for the renovation of a detention facility.
General Overview The Belknap County Department of Corrections is replacing the current buildings control system. The scope of this project is to completely remove the old system and replace it with a new Johnson Controls Facility Explorer Tridium Platform BacNet Control System. The bidding vendor shall be responsible for complete removal of the existing system, installation of a new front end/JACE, all field controllers, programming, graphics, and equipment. Please direct any questions to: Jon T. Bossey, Facilities Director Belknap County Commissioners Office 603-737-2391 jbossey@belknapcounty.gov Inventory/Points: AHU-1 Remove the existing controls and replace them with a Johnson Controls CGM controller. Program and commission the controls to operate per the sequence of operation consistent with the controller that was removed. The points to be rewired to the new controller shall be discharge air temperature. Mixed air temperature. Supply fan status. Exhaust fan 2 status. Exhaust fan 3 status. Exhaust fan 4 status. Low temperature alarm. Supply smoke alarm. Mixed air damper output. Heating valve output. Supply fan command. Outside air isolation damper command. Exhaust fan 21 command. AHU-1 Zones Remove the existing controls and replace them with a Johnson Controls CGM controller. Program and commission the controls to operate per the sequence of operation consistent with the controller that was removed. The points to be rewired to the new controller shall be Heating coil 1 temperature. Heating coil 2 temperature. Heating coil 3 temperature. Heating coil 4 temperature. Heating coil 5 temperature. Heating coil 6 temperature. Heating coil 7 temperature. Exhaust fan 21 status. Heating coil 1 valve output. Heating coil 2 valve output. Heating coil 3 valve output. Heating coil 4 valve output. Heating coil 5 valve output. Heating coil 6 valve output. Heating coil 7 valve output. AHU-2 Remove the existing controls and replace them with a Johnson Controls CGM controller. Program and commission the controls to operate per the sequence of operation consistent with the controller that was removed. The points to be rewired to the new controller shall be Discharge air temperature. Mixed air temperature. Heating coil 30 temperature. Heating coil 32 temperature. Heating coil 33 temperature. Supply fan status. Low temperature alarm. Mixed air damper output. Heating valve output. Heating coil 30 valve output. Heating coil 32 valve output. Heating coil 33 valve output. Supply fan command. Outside air isolation damper command. AHU-3 Remove the existing controls and replace them with a Johnson Controls CGM controller. Program and commission the controls to operate per the sequence of operation consistent with the controller that was removed. The points to be rewired to the new controller shall be Discharge air temperature. Mixed air temperature. Supply fan status. Exhaust fan 5 status. Exhaust fan 9 status. Exhaust fan 10 status. Low temperature alarm. Supply smoke alarm. Mixed air damper output. Heating valve output. Supply fan command. Outside air isolation damper command. Exhaust fan 9 command. Exhaust fan 10 command. AHU-3 Zones 1 Remove the existing controls and replace them with a Johnson Controls CGM controller. Program and commission the controls to operate per the sequence of operation consistent with the controller that was removed. The points to be rewired with the new controller shall be Heating coil 13 temperature. Heating coil 14 temperature. Heating coil 15 temperature. Heating coil 16 temperature. Heating coil 17 temperature. Heating coil 18 temperature. Heating coil 19 temperature. Heating coil 20 temperature. Heating coil 13 valve output. Heating coil 14 valve output. Heating coil 15 valve output. Heating coil 16 valve output. Heating coil 17 valve output. Heating coil 18 valve output. Heating coil 19 valve output. Heating coil 20 valve output. AHU-3 Zones 2 Remove the existing controls and replace them with a Johnson Controls CGM controller. Program and commission the controls to operate per the sequence of operation consistent with the controller that was removed. The points to be rewired to the new controller shall be Heating coil 21 temperature. Heating coil 22 temperature. Heating coil 21 valve output. Heating coil 22 valve output. AHU-4 Remove the existing controls and replace them with a Johnson Controls CGM controller. Program and commission the controls to operate per the sequence of operation consistent with the controller that was removed. The points to be rewired to the new controller shall be Discharge air temperature. Mixed air temperature. Supply fan status. Exhaust fan 1 status. Exhaust fan 6 status. Low temperature alarm. Supply smoke alarm. Mixed air damper output. Heating valve output. Supply fan command. Outside air isolation damper command. Exhaust fan 6 command. AHU-4 Zones Remove the existing controls and replace them with a Johnson Controls CGM controller. Program and commission the controls to operate per the sequence of operation consistent with the controller that was removed. The points to be rewired to the new controller shall be Heating coil 8 temperature. Heating coil 9 temperature. Heating coil 10 temperature. Heating coil 11 temperature. Heating coil 12 temperature. Heating coil 8 valve output. Heating coil 9 valve output. Heating coil 10 valve output. Heating coil 11 valve output. Heating coil 12 valve output. AHU-5 Remove the existing controls and replace them with a Johnson Controls CGM controller. Program and commission the controls to operate per the sequence of operation consistent with the controller that was removed. The points to be rewired to the new controller shall be Discharge air temperature. Mixed air temperature. Supply fan status. Low temperature alarm. Supply smoke alarm. Mixed air damper output. Heating valve output. Supply fan command. Outside air isolation damper command. Cooling command. AHU-5 Zones Remove the existing controls and replace them with a Johnson Controls CGM controller. Program and commission the controls to operate per the sequence of operation consistent with the controller that was removed. The points to be rewired to the new controller shall be Heating coil 23 temperature. Heating coil 24 temperature. Heating coil 25 temperature. Heating coil 26 temperature. Heating coil 27 temperature. Heating coil 23 valve output. Heating coil 24 valve output. Heating coil 25 valve output. Heating coil 26 valve output. Heating coil 27 valve output. AHU-6 Remove the existing controls and replace them with a Johnson Controls CGM controller. Program and commission the controls to operate per the sequence of operation consistent with the controller that was removed. The points to be rewired to the new controller shall be Discharge air temperature. Mixed air temperature. Supply air static pressure. Building pressure. Supply fan status. Return fan status. Low temperature alarm. Supply smoke alarm. Mixed air damper output. Exhaust air damper output. Heating valve output. Supply fan VFD output. Return fan VFD output. Supply fan command. Outside air isolation damper command. Cooling stage 1 command. Cooling stage 2 command.
Post-Bid
Jails / Prisons
$120,000.00
Public - County
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 15, 2024
June 14, 2024
76 County Dr, Laconia, NH
Related To This Project
Laconia, NH
Bid Date: May 16 2024
Laconia, NH
Bid Date: May 31 2024
Laconia, NH
Bid Date: Jun 24 2024
Laconia, NH
Bid Date: Jun 17 2024
Laconia, NH
Bid Date: Jul 22 2024
Laconia, NH
Bid Date: Aug 22 2024
Laconia, NH
Bid Date: Sep 11 2024
Laconia, NH
Bid Date: May 15 2024
Laconia, NH
Bid Date: May 15 2024
Laconia, NH
Bid Date: May 07 2024
Laconia, NH
Bid Date: Dec 13 2024
Laconia, NH
Bid Date: Apr 30 2024
Laconia, NH
Bid Date: Apr 26 2024
Laconia, NH
Bid Date: Apr 16 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
New Year, New Possibilities. Make the connections you need to kickstart 2025.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.