Renovation of a detention facility in Laconia, New Hampshire. Completed plans call for the renovation of a detention facility.

General Overview The Belknap County Department of Corrections is replacing the current buildings control system. The scope of this project is to completely remove the old system and replace it with a new Johnson Controls Facility Explorer Tridium Platform BacNet Control System. The bidding vendor shall be responsible for complete removal of the existing system, installation of a new front end/JACE, all field controllers, programming, graphics, and equipment. Please direct any questions to: Jon T. Bossey, Facilities Director Belknap County Commissioners Office 603-737-2391 jbossey@belknapcounty.gov Inventory/Points: AHU-1 Remove the existing controls and replace them with a Johnson Controls CGM controller. Program and commission the controls to operate per the sequence of operation consistent with the controller that was removed. The points to be rewired to the new controller shall be discharge air temperature. Mixed air temperature. Supply fan status. Exhaust fan 2 status. Exhaust fan 3 status. Exhaust fan 4 status. Low temperature alarm. Supply smoke alarm. Mixed air damper output. Heating valve output. Supply fan command. Outside air isolation damper command. Exhaust fan 21 command. AHU-1 Zones Remove the existing controls and replace them with a Johnson Controls CGM controller. Program and commission the controls to operate per the sequence of operation consistent with the controller that was removed. The points to be rewired to the new controller shall be Heating coil 1 temperature. Heating coil 2 temperature. Heating coil 3 temperature. Heating coil 4 temperature. Heating coil 5 temperature. Heating coil 6 temperature. Heating coil 7 temperature. Exhaust fan 21 status. Heating coil 1 valve output. Heating coil 2 valve output. Heating coil 3 valve output. Heating coil 4 valve output. Heating coil 5 valve output. Heating coil 6 valve output. Heating coil 7 valve output. AHU-2 Remove the existing controls and replace them with a Johnson Controls CGM controller. Program and commission the controls to operate per the sequence of operation consistent with the controller that was removed. The points to be rewired to the new controller shall be Discharge air temperature. Mixed air temperature. Heating coil 30 temperature. Heating coil 32 temperature. Heating coil 33 temperature. Supply fan status. Low temperature alarm. Mixed air damper output. Heating valve output. Heating coil 30 valve output. Heating coil 32 valve output. Heating coil 33 valve output. Supply fan command. Outside air isolation damper command. AHU-3 Remove the existing controls and replace them with a Johnson Controls CGM controller. Program and commission the controls to operate per the sequence of operation consistent with the controller that was removed. The points to be rewired to the new controller shall be Discharge air temperature. Mixed air temperature. Supply fan status. Exhaust fan 5 status. Exhaust fan 9 status. Exhaust fan 10 status. Low temperature alarm. Supply smoke alarm. Mixed air damper output. Heating valve output. Supply fan command. Outside air isolation damper command. Exhaust fan 9 command. Exhaust fan 10 command. AHU-3 Zones 1 Remove the existing controls and replace them with a Johnson Controls CGM controller. Program and commission the controls to operate per the sequence of operation consistent with the controller that was removed. The points to be rewired with the new controller shall be Heating coil 13 temperature. Heating coil 14 temperature. Heating coil 15 temperature. Heating coil 16 temperature. Heating coil 17 temperature. Heating coil 18 temperature. Heating coil 19 temperature. Heating coil 20 temperature. Heating coil 13 valve output. Heating coil 14 valve output. Heating coil 15 valve output. Heating coil 16 valve output. Heating coil 17 valve output. Heating coil 18 valve output. Heating coil 19 valve output. Heating coil 20 valve output. AHU-3 Zones 2 Remove the existing controls and replace them with a Johnson Controls CGM controller. Program and commission the controls to operate per the sequence of operation consistent with the controller that was removed. The points to be rewired to the new controller shall be Heating coil 21 temperature. Heating coil 22 temperature. Heating coil 21 valve output. Heating coil 22 valve output. AHU-4 Remove the existing controls and replace them with a Johnson Controls CGM controller. Program and commission the controls to operate per the sequence of operation consistent with the controller that was removed. The points to be rewired to the new controller shall be Discharge air temperature. Mixed air temperature. Supply fan status. Exhaust fan 1 status. Exhaust fan 6 status. Low temperature alarm. Supply smoke alarm. Mixed air damper output. Heating valve output. Supply fan command. Outside air isolation damper command. Exhaust fan 6 command. AHU-4 Zones Remove the existing controls and replace them with a Johnson Controls CGM controller. Program and commission the controls to operate per the sequence of operation consistent with the controller that was removed. The points to be rewired to the new controller shall be Heating coil 8 temperature. Heating coil 9 temperature. Heating coil 10 temperature. Heating coil 11 temperature. Heating coil 12 temperature. Heating coil 8 valve output. Heating coil 9 valve output. Heating coil 10 valve output. Heating coil 11 valve output. Heating coil 12 valve output. AHU-5 Remove the existing controls and replace them with a Johnson Controls CGM controller. Program and commission the controls to operate per the sequence of operation consistent with the controller that was removed. The points to be rewired to the new controller shall be Discharge air temperature. Mixed air temperature. Supply fan status. Low temperature alarm. Supply smoke alarm. Mixed air damper output. Heating valve output. Supply fan command. Outside air isolation damper command. Cooling command. AHU-5 Zones Remove the existing controls and replace them with a Johnson Controls CGM controller. Program and commission the controls to operate per the sequence of operation consistent with the controller that was removed. The points to be rewired to the new controller shall be Heating coil 23 temperature. Heating coil 24 temperature. Heating coil 25 temperature. Heating coil 26 temperature. Heating coil 27 temperature. Heating coil 23 valve output. Heating coil 24 valve output. Heating coil 25 valve output. Heating coil 26 valve output. Heating coil 27 valve output. AHU-6 Remove the existing controls and replace them with a Johnson Controls CGM controller. Program and commission the controls to operate per the sequence of operation consistent with the controller that was removed. The points to be rewired to the new controller shall be Discharge air temperature. Mixed air temperature. Supply air static pressure. Building pressure. Supply fan status. Return fan status. Low temperature alarm. Supply smoke alarm. Mixed air damper output. Exhaust air damper output. Heating valve output. Supply fan VFD output. Return fan VFD output. Supply fan command. Outside air isolation damper command. Cooling stage 1 command. Cooling stage 2 command.

Post-Bid

Jails / Prisons

$120,000.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
216
Active Projects
127
Bidding Soon
2,056
All Active Projects
703
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 15, 2024

June 14, 2024

img_map_placeholder

76 County Dr, Laconia, NH

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.