BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Sacramento, California. Completed plans call for site work for a playground / park / athletic field; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The work to be performed under these Special Provisions consists of the renovation of Renfree Field and the adjacent parking lot within Del Paso Park in Sacramento, CA. The improvements will consist of 8.3 acres. Including: constructing a new parking lot, basketball court, pickleball courts, multi-use playing field and related improvements. The work will include demolition, clearing and grubbing, tree removal, site grading and drainage, regular and colored concrete flatwork, concrete curbs and mow strips, aggregate base, asphalt paving, cobbles, dry wells, painted striping, baseball field backstops, chain link fencing, foul poles, poly capping, a basketball court, four pickleball courts, automatic irrigation system, irrigation well pump, booster pump and central control system, irrigation audit, landscaping, providing trees, turf and native hydroseeding, plant maintenance period, site electrical, conduits and pull boxes, drinking fountains, rules signs, park entry sign and benches. The project includes the following additive alternates: parking lot and pathway lighting, turf sod, trash receptacles, bleachers, flagpole, bat racks, scorer's table, post and cable fencing. storage containers, and conduit and pull boxes for future sports field lighting. License Requirements A, C-27 Liquidated Damages $1,000/Day Estimated Bid Value $2,984,085.50 Base Bid; $3,654,187.50 with Additive Alternates Start/Delivery Date 80 Working Days and 90 calendar days for Maintenance or Plant Establishment Project Duration 80 Working Days and 90 calendar days for Maintenance or Plant Establishment Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 05/15/2024 2:00 PM (PDT) Online Q&A Yes

Post-Bid

Playgrounds / Parks / Athletic Fields

$3,654,187.00

Public - City

Paving, Site Work

14

13

60

3

Subscribe For Documents

51 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
81
Bidding Soon
1,514
All Active Projects
627
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2024

September 8, 2024

img_map_placeholder

To Be Determined, Sacramento, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.