Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published August 19, 2026 at 8:00 PM
Updated November 23, 2026
Site work for a transportation facility in Seattle, Washington. Design plans call for site work for a transportation facility.
https://www.chronline.com/stories/light-rail-arrival-in-west-seattle-delayed-again,406707? Light rail trains won't arrive in West Seattle for another nine years, according to a schedule update issued Thursday by Sound Transit. The new target is 2035 to deliver an enlarged Sodo Station, a high-rise Duwamish River train bridge, 3.9 miles of tracks, and peninsular stations at Delridge and Alaska Junction. Sound Transit advertised a 2030 opening during the ST3 ballot campaign of 2016, when voters approved sales, car-tab and property tax increases to build a dozen rail and bus megaprojects including in West Seattle. The goal already slipped to 2032 during a realignment" caused by inflation early this decade. More engineering research, and extra time to control skyrocketing costs, are to blame for tacking on three more years, said a blog post the agency sent via email blast Thursday afternoon. "Though we know this shift is difficult news to folks who are eagerly awaiting light rail access in their communities, it represents a realistic delivery timeline that the agency can confidently stand behind," it said. The post said the 2035 date also was shared in a committee session Thursday. Originally estimated at $2.3 billion (in 2015 dollars), cost projections soared past $7 billion (in present and future dollars) as officials realized the true costs of real estate, and of building a 160-foot-high bridge over sloppy soils at Harbor Island, while construction inflation rose by 40% to 70% regionally and nationally. A new capital projects team says it clawed back some expenses by shrinking the future Sodo station for the new West Seattle line, by shifting turnaround tracks to devour less land at Alaska Junction, and most of all by scrapping the voter-approved Avalon Station, to make tunneling cheaper through the hillside. Brad Owen, acting deputy CEO of that division, says costs are now closer to $5 billion. The line would ultimately carry a predicted 25,000 daily passengers, who would save 15 minutes per trip compared with a bus going downtown. However, ridership would be far less for many years until a connecting trackway from Sodo to downtown and Seattle Center is built. Sound Transit, so far, has deemed the final segment to Ballard unaffordable until 2042 in the best-case scenario. As recently as this spring, the agency clung to a 2032 West Seattle date in its publications, even as it looked increasingly overoptimistic. At an April 1 community forum, Seattle Mayor Katie Wilson and Metropolitan King County Councilmember Teresa Mosqueda of West Seattle highlighted "shovels in the ground" this year, to encourage hope and sustain political momentum, as the public soaked in news of the agency's $35 billion shortfall that's causing delays and belt-tightening for other projects. Sound Transit's fresh 2035 revelation comes ironically (or perhaps by public relations design) on the same day the agency took several steps to move West Seattle's route forward. The System Expansion Committee on Thursday endorsed buying 55 properties, to make way for West Seattle tracks and stations, while boosting the right-of-way budget to $465 million. Those are full and partial buyouts or condemnations that run the gamut from houses to greenbelt to industrial sites. Appraisals, offer sheets, sales negotiations and court filings are expected to unfold gradually for two years, if the full board approves the plan Aug. 27. An additional $300 million is being budgeted to make headway next year on final engineering design, while preparing for tunnel and elevated construction. Sound Transit also reached an accord with Seattle City Light and Sodo businesses to relocate electric transmission towers in a way that reduces the need for construction on Sixth Avenue South. Preliminary finance reports assume $1 billion and hope for $3 billion in federal grants for West Seattle. However, the Trump administration has held up $1.9 billion in pending money for qualified "blue state projects including in New York and Los Angeles. Rep. Rick Larsen, D-Everett, has criticized the holdup, saying it could clog the pipeline for projects in many states, including Washington. © 2026 The Seattle Times. Visit www.seattletimes.com. Distributed by Tribune Content Agency, LLC. Facebook X (formerly Twitter) BlueSky LinkedIn Email Print Other items that may interest you State agency says improvements at juveniles rehab centers ongoing after audit raises concerns Thurston County man dies at the Gorge’s Bass Canyon festival; Seattle man arrested Washington state probes nonprofit over drug cleanup operations 151-pound marlin: Rare catch sets new Washington state record ----------------- https://www.yahoo.com/news/us/articles/no-longer-affordable-sound-transit-225906577.html Sound Transit’s governing board approved a sweeping overhaul of its voter-approved ST3 expansion plan Thursday, acknowledging a projected $34.5 billion funding gap that agency leaders say makes the original schedule unaffordable. The vote follows months of discussion over rising construction costs, inflation, lower-than-expected revenues and increasing operating expenses that have left the agency unable to fully fund the regional transit expansion package voters approved in 2016. An overflow crowd packed Sound Transit’s board meeting at Union Station, where transit advocates and riders urged board members to preserve projects promised to communities across the region. Voters approved ST3 in 2016, authorizing taxes to fund major transit investments including light rail extensions to West Seattle, Ballard, Tacoma and Everett. But Sound Transit leaders now say the original delivery schedule can no longer be supported by current financial projections. “The original delivery schedule is no longer affordable,” Sound Transit Board Chair Dave Somers told the board. “That’s a hard truth we’ve been facing for the last year.” Under the revised plan, some projects remain fully funded while others are delayed, phased or left without construction funding for now. Among the most visible changes is the West Seattle Link Extension. The project remains funded, but the planned Avalon Station is no longer included in the fully funded package. In Seattle, only the initial Ballard Link segment to Seattle Center is fully funded under the plan, while the extension from Seattle Center to Market Street in Ballard would require additional funding before construction could move forward. Sound Transit leaders say the revised plan allows the agency to continue advancing projects while aligning long-term costs with available revenue. The agency has also explored additional revenue sources and cost-saving measures, including fare gates, revenue from Washington’s Clean Fuels Standard carbon credit program and other operational changes. Transit advocates who attended the meeting urged the board not to delay projects further. “The build the damn trains coalition wanted to see light rail lines not be cut,” Transportation Choices Coalition Executive Director Kirk Hovenkotter told the board. “To keep projects moving because they only get more expensive the longer we wait and to have the board remember we are all in this together as one region.” Ballard supporters pressed the board for greater certainty about when service could reach their neighborhood, arguing that delays have made residents skeptical about future timelines. More in U.S. California woman left with horrific injuries after being attacked by gang of wild turkeys California Post 888 “We don’t trust that they’ll get to us if we don’t get a date,” Save Ballard Rail advocate Jonatan Gonzalez told the board while supporting an amendment seeking a clearer timeline for Ballard service. Sound Transit CEO Dow Constantine told board members the agency is legally required to adopt a system plan that matches current long-range financial projections. Agency officials say the largest funding challenges emerge in the mid-2030s, requiring difficult decisions now to avoid larger problems later. The board ultimately approved an amendment requiring Sound Transit to provide the public with a fixed date or date range for when service is expected to begin at Smith Cove, Interbay and Ballard stations by Aug. 1, 2026. Despite the revisions, Sound Transit leaders emphasized that they remain committed to eventually delivering the broader ST3 vision as additional funding, cost savings or new revenue sources become available. Deferred projects due to lack of resources: Tacoma Dome Link Extension Parking Everett Link Extension Parking Stride Bus Rapid Transit Parking North Sammamish Park-and-Ride Edmonds and Mukilteo Parking and Access Improvements Bus on Shoulder project SR 162 Corridor Improvements Sounder South Platform Extensions Sounder South Station Access Improvements ST Express Bus Base, remainder List of fully funded projects to be completed through construction: Tacoma Dome Access Improvements West Seattle Link Extension, no Avalon Station Renton Transit Center Parking Garage Tacoma Dome Link Extension Everett Link Extension, phase 1 Everett Link Extension, phase 2 Ballard Link Extension, initial segment to Seattle Center TCC Tacoma Link Extension (now 2043) South Kirkland – Issaquah Link (now 2050) Link Operations and Maintenance Facility South Link Operations and Maintenance Facility North Graham Street Station Sounder Maintenance Base Projects that are partially funded through the planning and design phase: Ballard Link Extension, final design phase Boeing Access Road Station, final design phase Sounder South additional trips (partially funded) DuPont Sounder Extension, planning phase Regional Parking Fund ST Express Bus Base (partially funded) High-capacity transit corridor studies/ST4 planning (partially funded) Unaffordable projects within current resources: Ballard Link Extension, Seattle Center to Market Street Boeing Access Road infill station Sounder additional trips DuPont Sounder Extension, final design and construction ----------------------------------- https://www.constructiondive.com/news/aecom-seattle-sound-transit-light-rail/814061/ AECOM secured work on a 19-contract program expected to generate $1 billion in engineering services for the expansion of Seattle’s regional transit network. Sound Transit, the Seattle public transit agency, selected the Dallas-based firm to deliver construction management services through three multiple-award task order contracts, according to a Feb. 27 news release. The work will cover civil and structural engineering work, including preliminary engineering and full design development. The five-year design contract also includes planning and environmental services, according to AECOM. “The full scope of our services — spanning design, environmental and project management support — underscores the deep value we offer our clients,” said Matt Crane, chief executive of AECOM’s U.S. West region, in the release. On the project and construction management services contract, AECOM will lead major capital expansion and ongoing enhancement programs. For environmental services, which covers planning for new infrastructure and renewal projects, the firm will work as a subconsultant. That includes systemwide planning, assessments, investigations and environmental clearance activities, according to the release. AECOM did not disclose the contracts’ amount. Specific dollar amounts for multiple-award task order contracts are typically allocated only as individual task orders are issued during the course of work. Sound Transit has issued 19 multiple-award task order contracts for the network’s upgrades. The projects aim to implement new facilities, upgrades and state-of-good repair work, and should generate roughly $1 billion in engineering services across the Seattle region, according to the release. In late December 2025, for example, Sound Transit awarded Chantilly, Virginia-based Parsons a position on the $1 billion ceiling multiple-award task order contracts. The projects support Sound Transit’s Sound Transit 3 capital program, one of the largest transportation infrastructure initiatives in North America, according to a Parsons news release. However, ST3, a voter approved expansion plan of the transit network, is facing significant budget deficits. The program total has reportedly ballooned up to $185 billion due to cost overruns, according to the Seattle Times. The multiple-award task order structure should reduce ST3 total project costs by about 5%, according to a September 2025 Sound Transit slide deck. Adding to the infrastructure portfolio The award marks an important win for AECOM’s infrastructure portfolio. AECOM recently highlighted transportation and program management work as areas of opportunity this year, according to executives’ comments on the firm’s most recent earnings call. For example, Gaurav Kapoor, AECOM’s chief financial officer, said to expect demand for these types of program management services to grow. He also added state and municipal construction budgets appeared much healthier than anticipated, a strong indicator for local level investment as well. ______________________________________________________________________________ https://www.seattletimes.com/seattle-news/transportation/light-rail-across-lake-washington-a-preview-before-riders-come-aboard/ MERCER ISLAND — One of Sound Transit’s practice trips demonstrated the allure Wednesday of future light rail trains across Lake Washington. The four-car train cruised at 55 mph over floating sections of the former Interstate 90 express lanes, with no shimmy and barely perceptible vibration. The ride took only about five minutes, between the Mercer Island and Judkins Park stations. Window seats offered views of Mount Rainier to the south, Mount Baker to the north, and an expanse of glassy water in the foreground, a hint of smog and unseasonably blue skies. During a light rail test run Wednesday across Lake Washington, Seattle is seen at the top of frame. At center is one of the novel “track bridges,” where flexible parts of the Interstate 90 floating bridge run beneath rails. (Ellen M. Banner / The Seattle Times) During a light rail test run Wednesday across Lake Washington, Seattle is seen at the top of frame. At center is one of the novel “track bridges,” where flexible parts of the Interstate 90 floating bridge run beneath rails. (Ellen M. Banner / The Seattle Times) During a light rail test run Wednesday across Lake Washington, Seattle is seen at the top of frame. At center is one of the novel “track bridges,” where flexible parts of the Interstate 90... (Ellen M. Banner / The Seattle Times)More Officials said they will announce the opening date Friday, for passengers to ride the 7-mile corridor that’s now a gap between South Bellevue and International District/Chinatown stations. The Eastside route, known as the 2 Line, will connect to the 1 Line in downtown Seattle and continue north to Lynnwood, while providing transfer connections to SeaTac and Federal Way. The full Eastside-Seattle line has taken nearly 18 years to deliver, plagued by planning and construction disputes. Sound Transit CEO Dow Constantine, eager to reach the finish line this spring, declared before Wednesday’s ride: “It’s coming up faster than you would have imagined.” Dow Constantine, Sound Transit CEO, speaks before a train carrying dignitaries and media crosses the I-90 floating bridge on Wednesday, Jan. 21, 2026. (Ellen Banner/ The Seattle Times) Engineers spent years figuring out how to deal with lake levels that rise and fall 2 feet per year, along with junctions where floating pontoons meet the sloped transition spans, which hinge next to the fixed bridge segments over land. Instead of building slip joints or rails that move, they invented “a brilliant solution” where the steel rails remain continuous, but eight platforms flex under the track ties. These curved structures rest upon rows of wafer-shaped seismic dampers, like those supporting the roofs of T-Mobile Park and Lumen Field. Advertising Skip Ad Skip Ad Skip Ad Dignitaries and members of the media go on a riidealong on the 2 Line across Lake Washington, between Mercer Island and Seattle the first trains ever on a floating bridge. Seattle is at top of frame. This is one of the exotic “track bridges” where the flexible parts of the bridge run beneath rails. Shot Wednesday, January 21, 2026. Related Light rail from Seattle to Bellevue set to open At full speed, the train passed one of these novel joint areas in silence, while another sounded like a rustling bag of toy marbles. A couple times, the train slowed to 35 mph. Project Director Tony Raben said crews are fine-tuning the electric power flow between overhead wires and the railcars, but expect a continuous 55 mph when passenger service begins. “It’s going to be a very proud and moment for our region, finally uniting the west and east sides with high capacity transit,” Constantine said, joined on the test run by Seattle Mayor Katie Wilson and Redmond Mayor Angela Birney, both transit board members. Seattle Mayor Katie Wilson, left, and Redmond Mayor Angela Birney ride the 2 Line on Interstate 90 across Lake Washington during a test run Wednesday. When service starts this spring, the trains be be the first ever to operate on a floating bridge. Alex Hudson, a senior adviser to Wilson, is in the background. (Ellen M. Banner / The Seattle Times) Seattle Mayor Katie Wilson, left, and Redmond Mayor Angela Birney ride the 2 Line on Interstate 90 across Lake Washington during a test run Wednesday. When service starts this spring, the trains be be the first ever to operate on a floating bridge. Alex Hudson, a senior adviser to Wilson, is in the background. (Ellen M. Banner / The Seattle Times) Seattle Mayor Katie Wilson, left, and Redmond Mayor Angela Birney ride the 2 Line on Interstate 90 across Lake Washington during a test run Wednesday. When service starts this spring, the trains be be... (Ellen M. Banner / The Seattle Times)More Wilson said that as someone who doesn’t own a car, “getting across to Mercer Island feels like a big deal … and so having the new Judkins Park station about to open up, and all of the connections between neighborhoods that’s going to enable, it just feels really liberating.” Planning maps and ballot measures have tantalized commuters since the late 1960s with a train line drawn across Lake Washington. Voters in 2008 passed the ST2 sales tax increase to fund the project, along with recent extensions to Lynnwood, Bellevue to Redmond, and Federal Way. This is one of the first-of-its-kind “track bridges” where the flexible parts of the Interstate 90 floating bridge run beneath rails. An announcement on when the 2 Line will open across Lake Washington, between Mercer Island and Seattle, will come Friday. The trains will be first ever on a floating bridge. (Ellen M. Banner / The Seattle Times) This is one of the first-of-its-kind “track bridges” where the flexible parts of the Interstate 90 floating bridge run beneath rails. An announcement on when the 2 Line will open across Lake Washington, between Mercer Island and Seattle, will come Friday. The trains will be first ever on a floating bridge. (Ellen M. Banner / The Seattle Times) This is one of the first-of-its-kind “track bridges” where the flexible parts of the Interstate 90 floating bridge run beneath rails. An announcement on when the 2 Line will open across Lake... (Ellen M. Banner / The Seattle Times)More The full corridor was supposed to open by 2020, but three years slipped because of route debates in Bellevue, and another three years when Sound Transit ordered contractors to rebuild thousands of track ties, known as plinths. Contractor Kiewit-Hoffman filed a formal claim in September for $184 million covering what it considered excessive changes and red tape, while Sound Transit sued in December, alleging defects in the original concrete and grout. The disputes remain unsettled, said Terri Mestas, deputy CEO for capital project delivery. Sound Transit’s board is scheduled to increase the budget $60 million Thursday, boosting the total to $3.82 billion between Seattle and Redmond Technology Station. The added money covers “additional startup costs,” related to delays, including administration, quality control, security, and technical work, to prevent stray current from harming the bridge. Mike Lindblom: 206-515-5631 or mlindblom@seattletimes.com. Mike Lindblom is a transportation reporter at The Seattle Times. --------------------------------- This project adds 4.1 miles of light rail service from SODO to West Seattle's Alaska Junction neighborhood and will include four new stations from SODO to Alaska Junction. As of December 22, 2025, this project is going through planning and environmental review under the National Environmental Policy Act (NEPA). Information regarding a general contractor or bidding timeline has not been disclosed by the owner. A timeline for construction has not been reached.
Design
Transportation Terminals
$5,600,000,000.00
Public - State/Provincial
Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2027
To Be Determined, Seattle, WA
Related To This Project
Seattle, WA
Bid Date: Jun 05 2024
Seattle, WA
Bid Date: May 23 2024
Seattle, WA
Bid Date: May 30 2024
Seattle, WA
--
Seattle, WA
Bid Date: Jun 06 2024
Seattle, WA
Bid Date: Jun 04 2024
Seattle, WA
Bid Date: May 31 2024
Seattle, WA
Bid Date: Jun 11 2024
Seattle, WA
--
Seattle, WA
Bid Date: May 08 2024
Seattle, WA
Bid Date: Jun 04 2024
Seattle, WA
Bid Date: May 24 2021
Seattle, WA
Bid Date: May 21 2024
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed