BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Fort Mill, South Carolina. Completed plans call for the renovation of a educational facility.

The Fort Mill School District is requesting a contractor to supply all equipment and materials required to remove and replace the gas pipes to nine (9) science classrooms on the E-Hallway at Fort Mill High School. Please see Vendor Registry for complete solicitation and details. You may also view our solicitation on the Fort Mill School District web site under Procurement and then Current Bids/RFP tab. The Fort Mill School District is requesting a contractor to supply all equipment and materials required to remove and replace the gas pipes to nine (9) science classrooms on the E-Hallwayat Fort Mill High School. This project will need to be completed between the dates of June 17th and June 28th , 2024. Scope of Work on Replacement of gas pipes. - Mobilization of all tools, equipment, materials and installation technicians - The scope of work is to re-feed underground gas piping to overhead at 9 Science Classrooms, add new emergency shutoff switches at each classroom and provide new gas fixtures where indicated in drawings. (See 1/8” Scale Plans for Details) - Demolition Notes: The plumbing contractor shall visit site prior to beginning work to determine the level of demolition required and include all necessary pricing in their bid. It is the plumbing contractor’s responsibility to field verify all existing piping, any discrepancies between existing conditions and plumbing plans should be brought to the attention of the engineer. - See stamped drawings for Alternates and Materials and Notes. - Plumbing contractor is responsible for all final gas connections to lab equipment. Coordinate with lab equipment supplier. See lab equipment drawings and lab equipment specifications for additional plumbing requirements. - Project will need to be done in coordination with the installation of new case work in the classrooms. Rough in’s to be completed prior to installation of the new countertops and final connections to be made after cabinet installation is complete. - Contractor will be responsible for removal and disposal of any old gas piping and other debris/trash created during the plumbing project

Award

Educational

$60,500.00

Public - City

Renovation

5

4

2

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
68
Bidding Soon
1,212
All Active Projects
574
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2024

June 17, 2024

img_map_placeholder

215 US-21, Fort Mill, SC

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.