BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Buena Vista, Colorado. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Reference Number 0000351745 Job Location: 142 Raven Way, Buena Vista, CO 81211 Project Overview: The Town of Buena Vista is seeking proposals from qualified contractors to lead the construction of Billy Cordova Memorial Park for the Town of Buena Vista. The park design includes a playground, post-tension concrete multipurpose court, outdoor workout equipment, labyrinth, grass open-play area, prefabricated pavilion/restroom structure, two parking areas, sidewalks, and landscaping. Park Information: The Billy Cordova Memorial Park will be a park that serves the entire Upper Arkansas River Valley. This park has special significance, due not only to the strategic location set to accommodate future growth and underserved populations, but also to honor first responders. The park design will have a special memorial and first responder theme, as the community has decided to name this park after fallen Chaffee County Fire Battalion Chief Billy Cordova. Park Location & Size: The park will be located at 142 Raven Way in Buena Vista, CO 81211. The park is roughly 33,000 square feet and is the size of 4 lots in the Sunset Vista IV subdivision. The park consists of lots 155, 156, 169, and 170 of the Sunset Vista IV subdivision, which were rezoned to Open Space & Recreation (OSR) and consolidated into one lot in February 2023. All property is owned by the Town of Buena Vista. Question Deadline 05/21/2024 at 5:00 PM MT Questions are submitted online No, Questions about the RFP can be submitted to Shane Basford, Recreation Director, at sbasford@buenavistaco.gov. Notice of Intent to Award Contract: Date: June 3, 2024 Construction Begins: Date: June 17, 2024 Project Complete: Date: October 31, 2024 Buyer Preferences, Guidelines & Requirements General Requirements - Installation Required - Insurance Required The Town reserves the right to reject any or all proposals, without obligation to the Town, and to negotiate additional terms or alterations with respect to the proposal. Scope of Work: 1 The contractor will schedule and lead all phases of construction for Billy Cordova Memorial Park. 2 The contractor will construct the park to the specifications provided in the engineered drawings and the project manual. 3 The contractor will serve as the contract administrator for the project and will manage subcontractors contracts and invoicing. 4 The contractor will conduct or subcontract services for all elements of park construction including, but not limited to: excavation and grading, concrete work, court striping/painting, irrigation and landscaping, fencing, utility work and connections for water, sewer, and electric, and installing a prefabricated restroom and pavilion. 5 The contractor will coordinate with Town to prepare for execution of the Community Build Days, including playground pit preparation and concrete. The contractor will also coordinate with Town for the installation of picnic tables, benches, trash cans, and bike racks that the Town will supply. 6 The contractor will not be responsible for: trail construction; memorial art features; labyrinth and small plantings; playground equipment supply, surface installation, and equipment assembly; and prefabricated restroom purchasing and delivery. 7 The contractor will ensure all necessary Town and County building permits have been secured by the Town of BV and secure additional permits if needed.

Award

Playgrounds / Parks / Athletic Fields

$864,296.00

Public - City

Paving, Site Work

123

21

90

5

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
29
Bidding Soon
568
All Active Projects
266
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2024

June 17, 2024

img_map_placeholder

142 Raven Way, Buena Vista, CO

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.