BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 26, 2025 at 8:00 PM

Updated August 27, 2025

Site work and new construction of a mixed-use development in Glastonbury, Connecticut. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

Silver/Petrucelli & Associates (SP+A) was retained to provide an architectural and engineering study for Glastonbury High School, evaluating the feasibility of constructing a new, 3,000 square foot weight training facility. The new weight training facility is intended to be a stand-alone structure, constructed in the location of the existing high school practice field, adjacent to the tennis courts and across the parking lot from the field house. The location of the proposed facility was purposeful due to the proximity to existing gas, water, and electric utilities, in an effort to limit site development costs. In order to create a campus feel and maintain standards for the Town and the School District of Glastonbury, it is proposed to construct the new weight facility in a style and with materials consistent with the new field house. As part of this study, SP+A reviewed existing construction documents of the field house. Additionally, SP+A retained the services of a geotechnical engineer to examine the existing soil conditions in the anticipated area of new construction. Down to Earth, Consulting LLC, was retained to perform site borings and the analysis said borings. To summarize the geotechnical findings, the results were positive, with the majority of borings indicating 24-48” depth of topsoil and fill. One boring at the southwest corner of the proposed building footprint indicated deeper depths of fill. While this is not a significant concern for the proposed facility, the variation in fill depth would be concerning if the location of the weight facility were to change. In the event that the location or size of the facility were to be significantly altered, SP+A recommends that additional soil investigations take place to confirm the viability of the new or expanded site. As stated previously, this is not recommended as the costs for site development and extension of site utilities, would increase exponentially As of August 26, 2025, this project has been completed.

Occupancy

Educational

$1,200,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2025

Project location map

330 Hubbard St, Glastonbury, CT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.