Renovation of an educational facility in Pearl City, Hawaii. Completed plans call for the renovation of a educational facility.

Purchase and Install an Electronic Marquee System to Be Mounted on Library External Wall A digital marquee 9 x 16. This will include cabling, rack, processor modules, PSU, cards and internals for display system contained within existing stand alone display along the roadside of parking lot. Pursuant to HRS 103D-305(b), Procurements greater than $50,000 for construction under subsection (a) shall require security by performance and payment bonds, pursuant to section 103D-324, delivered to the procurement officer, that are: (1) In a form prescribed by the rules of the policy board; (2) Executed by a surety company authorized to do business in this State; and (3) In an amount equal to one hundred percent of the price specified in the contract, or shall otherwise be secured by a performance bond in a manner satisfactory to the procurement officer. Liquidated Damages: In accordance with the Interim General Conditions, Article 7 Prosecution and Progress, Section 7.26 Failure to Complete the Work On Time, upon failure to complete the work or any portion of the work within the time or times fixed in the contract or extension thereof, the Contractor shall pay liquidated damages to the State, in the amount of $100, per calendar day of delay for contracts less than $50,000, or in the amount of $200, per calendar day of delay for contracts $50,000 or higher, unless otherwise noted. Okada Trucking Decision: "A" general engineering contractors and "B" general building contractors are reminded that due to the Hawaii Supreme Court's January 28, 2002 decision in Okada Trucking Co., Ltd. v. Board of Water Supply, et al., 97 Haw. 450 (2002), they are prohibited from undertaking any work, solely or as part of a larger project, which would require the general contractor to act as a specialty contractor in any area where the general contractor has no license. Although the "A" and "B" contractor may still bid on and act as the "prime" contractor on an "A" or "B" project (See, HRS 444-7 for the definitions of an "A" and "B" project.), respectively, the "A" and "B" contractor may only perform work in the areas in which they have the appropriate contractor's license (An "A" or "B" contractor obtains "C" specialty contractor's licenses either on its own, or automatically under HAR 16-77-32.). The remaining work must be performed by appropriately licensed entities. It is the sole responsibility of the contractor to review the requirements of this project and determine the appropriate licenses that are required to complete the project." The apparent low bidder shall furnish the required documents to the Department within 10 calendar days from the close of bids. If valid documents are not submitted on a timely basis for award of the contract, a bidder otherwise responsive and responsible may not receive the award. Bidder is responsible to apply for and submit the documents by the required deadlines.

Bid Results

Educational

$77,486.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
7
Bidding Soon
96
All Active Projects
47
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 24, 2024

June 7, 2024

img_map_placeholder

1460 Ho?olaule?a St, Pearl City, HI

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.