BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 12, 2025 at 8:00 PM

Updated May 13, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Cheshire, Connecticut. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

UPDATE The existing bridge (circa 1960) located just east of the linear trail has been designated for planned replacement. An inspection of the bridge was performed on July 13, 2023 and defects were noted. These deficiencies will need to be examined in further detail to determine the nature of repairs that would be needed to bring the superstructure and abutments into a state of good repair. Replacement should occur within the next five years, and this project should be a candidate for partial state reimbursement funding through the CTDOT Local Bridge Program. Given the age and condition of both the superstructure and the abutments, the construction cost for a full bridge replacement has been prepared. The expected useful life of a new bridge is 50 years Project is in Town of Cheshire capital budget fy 2024-2025 CIP _________________________________________________________ The existing bridge located just east of the linear trail has been designated for planned replacement. This structure dates from 1960. Replacement should occur within the next five years, and this project will be a candidate for partial state reimbursement funding. The cost is based on recent proposals received for similar bridge replacement projects. The expected useful life of a new bridge is 50 years. The project is include in the City's 2023-2028 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Bridges / Tunnels

$2,300,000.00

Public - City

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
841
Active Projects
406
Bidding Soon
6,911
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2027

Project location map

S Brooksvale Rd, Cheshire, CT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.